ArcelorMittal Warszawa steel plant — Poland
Steel Plant in Poland. Approximate location 52.29727, 20.92562.
Steel PlantPolandCO₂ estimate (modelled)
ArcelorMittal Warszawa steel plant is a steel plant in Poland. Its listed capacity is 750,000 t of steel. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Arcelormittal Warszawa SP zoo. By capacity it ranks #5 among 5 steel plants in Poland. It emits about 63,619 t CO₂e a year from Climate TRACE. That is 0.27% of the CO₂e from the 29 facilities in Poland that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 91% below the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567006.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Tosyali Toprakkale plant · 63,819 t CO₂e/yr · Türkiye
- Nucor Steel Seattle plant · 63,827 t CO₂e/yr · United States
- Sev.en GI Mo i Rana steel plant · 63,261 t CO₂e/yr · Norway
- Acciaierie Venete Borgo Valsugana steel plant · 64,393 t CO₂e/yr · Italy
- Acciaierie Venete Padua steel plant · 64,393 t CO₂e/yr · Italy
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Zeran power station · Gas · 490 MW · 5 km
- EC Żerań · Coal · 386 MW · 5 km
- EC Pruszków · Coal · 9 MW · 16 km
- Dębe · Hydro · 21 MW · 21 km
- PGE Solidarity power station · Gas · 60 MW · 37 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 750,000 t of steel, ArcelorMittal Warszawa steel plant is around the median steel plant in Poland (900,000 t of steel). Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 63,619 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 64k t CO₂e/yr (Scope 1), ArcelorMittal Warszawa steel plant carries €5.4M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.
Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest steel plants in Poland
Listed capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Arcelormittal Warszawa SP zoo.
Local climate
ArcelorMittal Warszawa steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 52.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1418 W/m² to ambient — roughly 1.09× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #5 largest of 5 steel plants in Poland by listed capacity (Climate TRACE).
Nearby industrial sites
- Coca-Cola Hbc Polska Sp. Z O.O. Filia W Radzyminie · Food & Beverage
- Mars Polska Sp. Z O.O. · Food & Beverage
- Ubojnia Drobiu Z Zakładem Filetowania "Cedrob" S.A. · Food & Beverage
- Mondelez Polska Production Sp. Z O.O. Fabryka Ciastek W Płońsku · Food & Beverage
- Ubojnia Drobiu Nr 2 W Ujazdówku · Food & Beverage
- Okręgowa Spółdzielnia Mleczarska W Łowiczu · Food & Beverage
Location
Coordinates 52.29727, 20.92562. View on OpenStreetMap.
Frequently asked questions
What type of facility is ArcelorMittal Warszawa steel plant?
ArcelorMittal Warszawa steel plant is a steel plant in Poland. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
What capacity is listed for ArcelorMittal Warszawa steel plant?
The open dataset lists 750,000 t of steel of capacity for ArcelorMittal Warszawa steel plant.
How much CO₂ does ArcelorMittal Warszawa steel plant emit?
The page uses about 63,619 t CO₂e/year from the open dataset It ranks #24 among facilities in Poland by estimated CO₂.
Where is ArcelorMittal Warszawa steel plant located?
ArcelorMittal Warszawa steel plant is in Poland at approximately 52.29727, 20.92562.
Who operates ArcelorMittal Warszawa steel plant?
The operator recorded in the open dataset is Arcelormittal Warszawa SP zoo.