Sev.en GI Mo i Rana steel plant — Norway
Steel Plant in Norway. Approximate location 66.31103, 14.16866.
Steel PlantNorwayCO₂ estimate (modelled)
Sev.en GI Mo i Rana steel plant is a steel plant in Norway. Its listed capacity is 770,000 t of steel. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Sev.en Global Investments AS. It emits about 63,261 t CO₂e a year from Climate TRACE. That is 0.44% of the CO₂e from the 46 facilities in Norway that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 91% below the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566992.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- ArcelorMittal Warszawa steel plant · 63,619 t CO₂e/yr · Poland
- Tosyali Toprakkale plant · 63,819 t CO₂e/yr · Türkiye
- Nucor Steel Seattle plant · 63,827 t CO₂e/yr · United States
- Pittini Acciaierie di Verona steel plant · 62,396 t CO₂e/yr · Italy
- Acciaierie Venete Borgo Valsugana steel plant · 64,393 t CO₂e/yr · Italy
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Langvatn · Hydro · 90 MW · 3 km
- Mofjellet · Hydro · 1 MW · 4 km
- Rana · Hydro · 570 MW · 5 km
- Kvannvatn · Hydro · 4 MW · 20 km
- Fagervollan · Hydro · 21 MW · 24 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 770,000 t of steel, Sev.en GI Mo i Rana steel plant is around the median steel plant in Norway (770,000 t of steel). Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 63,261 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 63k t CO₂e/yr (Scope 1), Sev.en GI Mo i Rana steel plant carries €5.4M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.
Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Sev.en Global Investments AS. All facilities by this operator →
Local climate
Sev.en GI Mo i Rana steel plant sits in a subarctic (boreal) climate zone (Köppen Dfc), at 66.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1486 W/m² to ambient — roughly 1.14× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Elkem Rana AS · Metals Plant · 298,000 t CO₂
- Ferroglobe Mangan Norge AS · Metals Plant · 139,730 t CO₂
- Glencore Manganese Norway · Metals Plant · 2,730 t CO₂
- Sma Mineral As · Lime Plant · 76,331 t CO₂
- Alcoa Mosjøen · Metals Plant · 425,000 t CO₂
- Mosjoen aluminium plant · Aluminium Smelter · 432,548 t CO₂
Location
Coordinates 66.31103, 14.16866. View on OpenStreetMap.
Frequently asked questions
What type of facility is Sev.en GI Mo i Rana steel plant?
Sev.en GI Mo i Rana steel plant is a steel plant in Norway. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
What capacity is listed for Sev.en GI Mo i Rana steel plant?
The open dataset lists 770,000 t of steel of capacity for Sev.en GI Mo i Rana steel plant.
How much CO₂ does Sev.en GI Mo i Rana steel plant emit?
The page uses about 63,261 t CO₂e/year from the open dataset It ranks #40 among facilities in Norway by estimated CO₂.
Where is Sev.en GI Mo i Rana steel plant located?
Sev.en GI Mo i Rana steel plant is in Norway at approximately 66.31103, 14.16866.
Who operates Sev.en GI Mo i Rana steel plant?
The operator recorded in the open dataset is Sev.en Global Investments AS.