Inzonex
Modelled facility data · 2023

Largest cement facility estimates in this dataset

The order is based on Climate TRACE modelled estimates for 2023 after repeated placeholder values are removed.

Download the tableRead the methodology
01

Data status

This is a ranking within the stated modelled dataset. It is not a verified emissions league table, a current inventory or a liability ranking.

02

Largest estimates in this dataset

RankFacilityCountryModelled sectorEstimated t CO2, 2023
1Jinfeng Cement PlantChinacement6,703,459
2Sungshin Cement Danyang Cement PlantSouth Koreacement6,146,734
3Obajana Cement PlantNigeriacement5,910,670
4Lucky Cement Pezu Cement PlantPakistancement5,508,813
5Semen Gresik Tuban Cement PlantIndonesiacement5,147,322
6TPI Polene Mittaphap Cement PlantThailandcement4,529,439
7Anhui Panjing Cement Co. Cement PlantChinacement4,351,463
8National Cement New Beni Suef Cement PlantEgyptcement4,345,506
9Sokoto Cement PlantNigeriacement4,320,860
10China Resources Cement (Fengkai) Ltd Cement PlantChinacement4,250,669
11Sichuan Xingchuancheng Cement Co.,Ltd. Cement PlantChinacement4,249,812
12Indocement Tunggal Prakarsa Citeureup Cement PlantIndonesiacement4,236,315
13Kesoram Industries Gulbarga Cement PlantIndiacement4,165,911
14UltraTech Anantapuram Cement PlantIndiacement4,123,869
15Lafarge Attaka Cement PlantEgyptcement4,073,231
16Sichuan Easun Cement Group Co. Cement PlantChinacement4,051,303
17Dongfang Hope Chongqing Cement Co.,Ltd. Cement PlantChinacement3,929,237
18Eagle Bulacan Cement PlantPhilippinescement3,801,584
19Semen Tonasa Cement PlantIndonesiacement3,795,567
20Shandong Shenfeng Cement Group Co. Cement PlantChinacement3,700,459

Download this table as CSV

Inzonex removable modular insulation on industrial equipment
Equipment heat loss

Measure exposed hot surfaces

Use measured surface area, temperature and operating hours to calculate heat loss from boilers, kilns, heat exchangers, valves and pipework. Inzonex supplies removable modular insulation for equipment that requires maintenance access.

  • Design target: surface temperature at or below 45 °C, subject to the application and design review
  • Claimed heat-loss reduction: up to 96%, subject to the measured boundary and insulation specification
  • Removable construction for inspection and maintenance access
  • Calculation record available for the selected equipment and operating conditions

Do not add a calculated reduction to an emissions report until the reporting boundary, factor, implementation date and verification method have been approved.

Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.