The dataset contains 10 records after repeated placeholder values are removed. The estimated total is 8,582,317 tonnes of carbon dioxide for 2023.
These are Climate TRACE modelled estimates for 2023. They are not verified declarations, current emissions, tax liabilities or CBAM liabilities.
Some records may represent facility clusters. Confirm the facility, operator, installation boundary, sector and reporting period before use.
| Rank | Facility | Modelled sector | Estimated t CO2, 2023 |
|---|---|---|---|
| 1 | Ezz Flat Steel Ain Sokhna plant | iron-and-steel | 2,057,231 |
| 2 | Egyptian Sponge Iron and Steel Company Sadat City plant | iron-and-steel | 1,939,321 |
| 3 | Al-Ezz Dekheila Steel Alexandria plant | iron-and-steel | 1,687,985 |
| 4 | Suez Steel Solb Misr Attaka plant | iron-and-steel | 1,357,525 |
| 5 | Egyptian American Steel Rolling Company Sadat City plant | iron-and-steel | 632,994 |
| 6 | Ezz Steel Rebar Sadat City plant | iron-and-steel | 527,495 |
| 7 | Egyptian Steel Beni Suef plant | iron-and-steel | 102,396 |
| 8 | Egyptian Steel Ain Sokhna plant | iron-and-steel | 102,396 |
| 9 | Delta Steel Mill Al Qalyubia plant | iron-and-steel | 87,487 |
| 10 | Al Gioshy Steel Ain Sokhna plant | iron-and-steel | 87,487 |
Use measured surface area, temperature and operating hours to calculate heat loss from boilers, kilns, heat exchangers, valves and pipework. Inzonex supplies removable modular insulation for equipment that requires maintenance access.
Do not add a calculated reduction to an emissions report until the reporting boundary, factor, implementation date and verification method have been approved.
Country data for Egypt · Industry assessment for iron and steel