The dataset contains 29 records after repeated placeholder values are removed. The estimated total is 51,561,246 tonnes of carbon dioxide for 2023.
These are Climate TRACE modelled estimates for 2023. They are not verified declarations, current emissions, tax liabilities or CBAM liabilities.
Some records may represent facility clusters. Confirm the facility, operator, installation boundary, sector and reporting period before use.
| Rank | Facility | Modelled sector | Estimated t CO2, 2023 |
|---|---|---|---|
| 1 | Zhejiang Petroleum & Chemical, Zhejiang, Zhoushan | petrochemical-steam-cracking | 6,803,536 |
| 2 | Sinopec Zhenhai Petrochemical, Zhejiang, Zhenhai | petrochemical-steam-cracking | 3,761,677 |
| 3 | CNOOC & Shell Petrochemical, Guangdong, Daya Bay | petrochemical-steam-cracking | 3,761,677 |
| 4 | Petrochina Dushanzi Petrochemical, Xinjiang, Dushanzi | petrochemical-steam-cracking | 3,419,707 |
| 5 | Luqing Petrochemical, Shandong, Shouguang | petrochemical-steam-cracking | 2,833,363 |
| 6 | Satellite Chemical (STL), Jiangsu, Lianyungang | petrochemical-steam-cracking | 2,709,985 |
| 7 | Hengli Petrochemical, Liaoning, Dalian | petrochemical-steam-cracking | 2,564,780 |
| 8 | Zhonghan Wuhan Petrochemical, Hubei, Wuhan | petrochemical-steam-cracking | 2,393,795 |
| 9 | Sinopec - SABIC Tianjin Petrochemical, Tianjin, Tianjin | petrochemical-steam-cracking | 2,222,809 |
| 10 | Petrochina Guangdong Petrochemical, Guangdong, Jieyang | petrochemical-steam-cracking | 2,051,824 |
Use measured surface area, temperature and operating hours to calculate heat loss from boilers, kilns, heat exchangers, valves and pipework. Inzonex supplies removable modular insulation for equipment that requires maintenance access.
Do not add a calculated reduction to an emissions report until the reporting boundary, factor, implementation date and verification method have been approved.
Country data for China · Industry assessment for petrochemical steam cracking