Inzonex Carbon Hubpowered by inzonex.co.uk
Carbon HubCountry × industry → Chile · Pulp & paper
Data layer · est. 2023

Pulp & paper in Chile: emitters, CO2 & carbon value

8 tracked facilities, ≈2,924,173 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing pulp & paper.

The numbers

Pulp & paper in Chile at a glance

MetricValueNote
Facilities tracked8with CO2 estimates
Total est. CO22,924,173 t/yrClimate TRACE 2023
Average per facility365,522 t/yr
Gross value (full price)€234M/yrall tracked CO2 × €80.01/t EUA — before free allocation / EU-bound share

Carbon pricing here: Carbon tax US$5/t on large emitters; reform discussions ongoing (World Bank State & Trends of Carbon Pricing 2025 / ICAP 2025). Current benchmark: no liquid market price. Full country page: carbon price in Chile.

Largest emitters

Top 8 pulp & paper CO2 emitters in Chile

#FacilityOwnert CO2/yr (est. 2023)Indicative value
1Celulosa Arauco y Constitución - Arauco Pulp MillCelulosa Arauco y Constitución SA989,562€79.2M
2Nueva Aldea pulpCelulosa Arauco y Constitución SA837,321€67.0M
3Celulosa Arauco y Constitución S.A. - Constitución Pulp MillCelulosa Arauco y Constitución SA365,522€29.2M
4CMPC Celulosa S.A. Sante FeCMPC Celulosa SA332,391€26.6M
5Celulosa Arauco y Constitución S.A. - Valdivia Pulp MillCelulosa Arauco y Constitución SA167,464€13.4M
6CMPC Pulp Pacific PlantEmpresas CMPC SA126,867€10.2M
7CMPC Celulosa S.A. - Laja MillCMPC Celulosa SA65,971€5.3M
8Celulosa Arauco y Constitución S.A. - Licancel Pulp MillCelulosa Arauco y Constitución SA39,075€3.1M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Inzonex removable modular insulation on industrial equipment
Cut the tonnes at the source

Hot industrial equipment? Cut the heat loss.

Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes Inzonex Modular Insulation — snap-fastened modules engineered per temperature tier, not generic off-the-shelf jackets:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature ≤45 °C — touch-safe for workers (EN ISO 13732-1)
  • 6× faster maintenance access vs standard insulation jackets and metal cladding/boxes — unclips and refits in minutes, no destruction
  • Inspectable — opens for corrosion-under-insulation checks, then refits like-new (generic jackets often don't survive removal)
  • Typical payback under 2 years — some sites 9–11 months

Every tonne you stop emitting is a tonne you don't have to report: cutting heat loss is a measurable, auditable Scope 1 reduction that flows straight into EU ETS, CBAM and your ESG / CSRD disclosures — not an offset, an actual emission cut.

Same industry, other countries
Other industries in Chile
FAQ

Questions

How many pulp & paper facilities does Chile have with tracked emissions?
8 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈2,924,173 t CO2/yr.
What is the largest pulp & paper emitter in Chile?
Celulosa Arauco y Constitución - Arauco Pulp Mill — ≈989,562 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the EU price?
The gross full-price value is ≈€234M/yr (all tracked CO2 × €80.01/t EUA). Actual EU ETS cost is lower — free allocation still covers most industrial emissions, phasing out 2026→2034.
How this page is built: heat-loss figures follow ASTM C680 / ISO 12241 (the method behind our public calculators); facility emissions from Climate TRACE & EU ETS verified data across 30,000+ industrial sites; the 2026–2034 schedule is Regulation (EU) 2023/956, not a forecast. Published by Inzonex Research. Spotted an error? Tell us — we correct on evidence.
Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.