11 tracked facilities, ≈2,037,124 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing lime.
| Metric | Value | Note |
|---|---|---|
| Facilities tracked | 11 | with CO2 estimates |
| Total est. CO2 | 2,037,124 t/yr | Climate TRACE 2023 |
| Average per facility | 185,193 t/yr | |
| Indicative carbon value | €154M/yr | at €75.36/t CBAM |
Carbon pricing here: Industrial OBPS systems continue (≈C$80/t trajectory, 2025); consumer fuel charge removed Apr 2025. Current benchmark: no liquid market price. Full country page: carbon price in Canada.
| # | Facility | Owner | t CO2/yr (est. 2023) | Indicative value |
|---|---|---|---|---|
| 1 | Dundas Operations | — | 427,791 | €32.2M |
| 2 | Usine De Bedford | — | 410,189 | €30.9M |
| 3 | Beachville Operation | — | 382,459 | €28.8M |
| 4 | Usine De Marbleton | — | 183,830 | €13.9M |
| 5 | Exshaw Plant | — | 168,836 | €12.7M |
| 6 | Northern Lime Limited | — | 130,879 | €9.9M |
| 7 | Faulkner Plant | — | 109,753 | €8.3M |
| 8 | Havelock Plant | — | 61,953 | €4.7M |
| 9 | Pavilion Plant | — | 58,537 | €4.4M |
| 10 | Langley Plant | — | 56,967 | €4.3M |
Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.
Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes patented (UK GB2508992.1) removable modular insulation — snap-fastened covers engineered per temperature tier, not generic off-the-shelf jackets: