The dataset contains 22 records after repeated placeholder values are removed. The estimated total is 51,090,171 tonnes of carbon dioxide for 2023.
These are Climate TRACE modelled estimates for 2023. They are not verified declarations, current emissions, tax liabilities or CBAM liabilities.
Some records may represent facility clusters. Confirm the facility, operator, installation boundary, sector and reporting period before use.
| Rank | Facility | Modelled sector | Estimated t CO2, 2023 |
|---|---|---|---|
| 1 | ArcelorMittal Tubarão steel plant | iron-and-steel | 11,135,928 |
| 2 | Ternium Brasil Santa Cruz steel plant | iron-and-steel | 8,118,406 |
| 3 | CSN Volta Redonda steel plant | iron-and-steel | 7,646,497 |
| 4 | Usiminas Ipatinga steel plant | iron-and-steel | 7,498,648 |
| 5 | Gerdau Açominas Ouro Branco steel plant | iron-and-steel | 4,705,160 |
| 6 | ArcelorMittal Pecém steel plant | iron-and-steel | 4,697,227 |
| 7 | ArcelorMittal Monlevade steel plant | iron-and-steel | 1,835,723 |
| 8 | AVB Açailândia steel plant | iron-and-steel | 940,896 |
| 9 | Gerdau Divinópolis steel plant | iron-and-steel | 697,243 |
| 10 | ArcelorMittal Piracicaba steel plant | iron-and-steel | 612,471 |
Use measured surface area, temperature and operating hours to calculate heat loss from boilers, kilns, heat exchangers, valves and pipework. Inzonex supplies removable modular insulation for equipment that requires maintenance access.
Do not add a calculated reduction to an emissions report until the reporting boundary, factor, implementation date and verification method have been approved.
Country data for Brazil · Industry assessment for iron and steel