Home / Asia / Indonesia / Tonasa Cement Plant power station

Tonasa Cement Plant power station

Coal power plant in , Indonesia. Approximate location -4.816711, 119.501684.

CoalIndonesiasubcritical

Tonasa Cement Plant power station is a 70 MW coal power plant in , Indonesia. It is operated by PT Semen Gresik [100%]. Based on its capacity (estimated), it can supply roughly 88k homes (estimated). It ranks #298 of 401 Indonesia power plants by installed capacity. Commissioned in 2013, it is around 13 years old — relatively modern. In context, coal supplies about 61.5% of Indonesia's electricity; the national grid averages 680 gCO₂/kWh (18.1% low-carbon) (2024).

70MW installed capacity
87,600homes powered (est.)
2013commissioned (~13 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id GEM_coa_tonasacement_indon.

Data status

Known data

FacilityTonasa Cement Plant power station GEM-coal
CountryIndonesia · GEM-coal
Coordinates-4.816711, 119.501684 GEM-coal
FuelCoal GEM-coal
MW installed capacity70 MW GEM · 2026 · L100000102793; operating plant capacity
OwnerPT Semen Gresik [100%] GEM-coal
Commissioned2013 GEM-coal
Technologysubcritical GEM-coal

Calculated from dataset

CO₂ emissions306,600 t CO₂·a⁻¹ calculated
Capacity rank in country#298 / 401 calculated
Fuel-specific rank in country#157 / 191 calculated
Capacity vs country/fuel peers0.32× · 220 MW · n=191 calculated
Homes-powered equivalent87,600 calculated
Environmental severityC5 · 47/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.

capacity: GEM · 2026 · L100000102793; fuel: GEM GCPT

In context: how this plant compares

At 70 MW, Tonasa Cement Plant power station is below the median coal plant in Indonesia (220 MW). Technically it is described as subcritical. Coal plants burn pulverised coal to raise high-pressure steam for a turbine; they run as baseload but are the most carbon-intensive mainstream source and the first targeted for retirement or efficiency retrofits.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest coal plants in Indonesia

PLTU Paiton I Unit 7 & 8: 5,355 MW5kPLTU Paito…Weda Bay power station: 4,540 MW5kWeda Bay p…PLTU Suralaya: 3,400 MW3kPLTU Sural…Sulawesi Labota power station: 3,360 MW3kSulawesi L…Nanshan Industrial Park power station: 2,880 MW3kNanshan In…Bangko Tengah power station: 2,640 MW3kBangko Ten…Xinyi Group captive power station: 2,500 MW2kXinyi Grou…PT Halmahera Persada Lygend Nickel Smelter power station: 2,390 MW2kPT Halmahe…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by PT Semen Gresik [100%].

Climate zone & how it works

This coal plant burns coal to raise high-pressure steam that spins a turbine-generator. It sits in a tropical monsoon climate (Köppen Am) — Southern Hemisphere, latitude 4.8°S — which shapes how much energy it can produce and how its output varies through the year.

~26°Ctypical annual mean
~28°Ctypical warm-season mean
Tropical monsoon: hot and humid year-round with little seasonal variation

Climate zone & typical temperatures: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
47/100environmental-severity index
1.5°Cseasonal temperature swing
22 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #157 largest coal power plant of 191 in Indonesia by capacity.

Indonesia has 191 coal power plants in this dataset, together about 101,995 MW of capacity.

Nearby power plants

Location

Coordinates -4.816711, 119.501684 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is Tonasa Cement Plant power station?

Tonasa Cement Plant power station is a 70 MW coal power plant in , Indonesia, commissioned in 2013.

How many homes can Tonasa Cement Plant power station power?

Its output is enough to supply roughly 87,600 homes (estimated).

Who operates Tonasa Cement Plant power station?

Tonasa Cement Plant power station is operated by PT Semen Gresik [100%].

Built from open public data; no personal information. Operate this site? Request a correction or removal.