Taiheiyo Cement Kamiiso power station is a 47.6 MW coal power plant in Hokkaidō, Japan. It is operated by Taiheiyo Cement Corp [100%]. Based on its capacity (estimated), it can supply roughly 60k homes (estimated). It ranks #330 of 692 Japan power plants by installed capacity. Commissioned in 1993, it is around 33 years old — long-established. In context, coal supplies about 32.1% of Japan's electricity; the national grid averages 477 gCO₂/kWh (32.7% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id GEM_coa_taiheiyocementkamiis_japan.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.
capacity: GEM · 2026 · L100000104857; fuel: GEM GCPT
At 47.6 MW, Taiheiyo Cement Kamiiso power station is below the median coal plant in Japan (250 MW). Technically it is described as subcritical. Coal plants burn pulverised coal to raise high-pressure steam for a turbine; they run as baseload but are the most carbon-intensive mainstream source and the first targeted for retirement or efficiency retrofits.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by Taiheiyo Cement Corp [100%].
This coal plant burns coal to raise high-pressure steam that spins a turbine-generator. It sits in a warm-summer humid continental climate (Köppen Dfb) — Northern Hemisphere, latitude 41.8°N — which shapes how much energy it can produce and how its output varies through the year.
Climate zone & typical temperatures: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with thermal cycling the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #89 largest coal power plant of 94 in Japan by capacity.
Japan has 94 coal power plants in this dataset, together about 53,431 MW of capacity.
Coordinates 41.818468, 140.631701 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Taiheiyo Cement Kamiiso power station is a 47.6 MW coal power plant in Hokkaidō, Japan, commissioned in 1993.
Its output is enough to supply roughly 59,568 homes (estimated).
Taiheiyo Cement Kamiiso power station is operated by Taiheiyo Cement Corp [100%].