Biomass power plant in Shanghai Shi, China. Approximate location 31.0926, 121.1044.

BiomassShanghai ShiChina

Shanghai Tianma power station is a 60 MW biomass power plant in Shanghai Shi, China. It is operated by Shanghai Environment Group Co Ltd. Based on its capacity (estimated), it can supply roughly 82,594 homes (estimated). It ranks #2310 of 5,959 China power plants by installed capacity. In context, biomass supplies about 2.0% of China's electricity; the national grid averages 525 gCO₂/kWh (41.7% low-carbon) (2025).

60MW installed capacity
82,594homes powered (est.)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id CT-4327.

Capacity vs largest biomass plants in China

Guangdong Guangzhou Huangpu District power station: 250 MW250Guangdong …Guangdong Zhanjiang (Chenming) power station: 240 MW240Guangdong …Hubei Jianli (Nine Dragons Paper) power station: 240 MW240Hubei Jian…Guangdong Shenzhen East power station: 180 MW180Guangdong …Guangdong Xinfeng power station: 180 MW180Guangdong …Guangxi Beihai (Sun Paper) power station: 160 MW160Guangxi Be…Shanghai Laogang power station: 150 MW150Shanghai L…Zhejiang Linjiang power station: 135 MW135Zhejiang L…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by Shanghai Environment Group Co Ltd. All plants by this company →

Local climate & thermal context

This biomass plant burns organic material (wood, residues) to raise steam for a turbine. It sits in a humid subtropical climate (Köppen Cfa) — Northern Hemisphere, latitude 31.1°N — which shapes how much energy it can produce and how its output varies through the year.

16.3°Cannual mean temp
1,652heating degree-days (base 18°C)
1,043cooling degree-days (base 18°C)
4 melevation

Monthly mean temperature

J: 4 °CJF: 6 °CFM: 9 °CMA: 15 °CAM: 20 °CMJ: 24 °CJJ: 28 °CJA: 28 °CAS: 24 °CSO: 19 °CON: 13 °CND: 7 °CD28 °C

Heating degree-days here run 33% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 37/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

In colder climates, uninsulated hot equipment (boilers, turbines, valves, steam lines) loses proportionally more heat to ambient air — exactly the loss Inzonex modular insulation is designed to cut.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

How it compares & nearby plants

The #77 largest biomass power plant of 981 in China by capacity.

China has 981 biomass power plants in this dataset, together about 29,906 MW of capacity.

Nearby power plants

Location

Coordinates 31.0926, 121.1044 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Built from open public data; no personal information. Operate this site? Request a correction or removal.