Home / North America / Nicaragua / San Jacinto-Tizate Geothermal Power Plant Nicaragua

San Jacinto-Tizate Geothermal Power Plant Nicaragua

Geothermal power plant in Leon, Nicaragua. Approximate location 12.6088, -86.773.

GeothermalLeonNicaragua

San Jacinto-Tizate Geothermal Power Plant Nicaragua is a 82 MW geothermal power plant in Leon, Nicaragua. Based on its capacity (estimated), it can supply roughly 154k homes (estimated). It ranks #4 of 19 Nicaragua power plants by installed capacity. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, geothermal supplies about 15.3% of Nicaragua's electricity; the national grid averages 301 gCO₂/kWh (62.4% low-carbon) (2024).

82MW installed capacity
153,925homes powered (est.)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id GEODB0043607.

Data status

Known data

FacilitySan Jacinto-Tizate Geothermal Power Plant Nicaragua WRI
CountryNicaragua · Leon WRI
Coordinates12.6088, -86.773 WRI
FuelGeothermal WRI
MW installed capacity82 MW WRI GPPD; source record

Calculated from dataset

Capacity rank in country#4 / 19 calculated
Fuel-specific rank in country#1 / 2 calculated
Homes-powered equivalent153,925 calculated
Climate26.4°C · HDD 0 derived from coordinates
Environmental severityC5 · 48/100 derived from coordinates

Not available

OwnerNot available not in dataset
CommissionedNot available not in dataset
TechnologyNot available not in dataset
GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

Capacity and fuel are the upstream open-dataset record, not yet matched to a 2026 registry or GEM entry.

capacity: WRI GPPD; fuel: WRI GPPD

In context: how this plant compares

Geothermal plants tap underground heat to raise steam for a turbine; they provide steady, low-carbon baseload but are limited to geologically active regions.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Key facts

Share of Nicaragua geothermal capacity
51.6% of 159 MW across 2 plants in this dataset

Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).

Capacity vs largest geothermal plants in Nicaragua

San Jacinto-Tizate Geothermal Power Plant Nicaragua: 82 MW82San Jacint…Momotombo Geothermal Power Plant Nicaragua: 77 MW77Momotombo …

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Local climate & thermal context

This geothermal plant taps underground heat to raise steam that drives a turbine. It sits in a tropical savanna climate (Köppen Aw) — Northern Hemisphere, latitude 12.6°N — which shapes how much energy it can produce and how its output varies through the year.

26.4°Cannual mean temp
0heating degree-days (base 18°C)
3,059cooling degree-days (base 18°C)
231 melevation

Monthly mean temperature

J: 26 °CJF: 26 °CFM: 27 °CMA: 28 °CAM: 28 °CMJ: 26 °CJJ: 27 °CJA: 26 °CAS: 26 °CSO: 26 °CON: 25 °CND: 25 °CD28 °C

This site has effectively no heating season (tropical/equatorial climate), so winter heat loss is not the driver here. The thermal concern shifts to year-round process heat and humidity/heat-driven corrosion of hot equipment.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
48/100environmental-severity index
3.0°Cseasonal temperature swing
46 kmdistance to coast

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #1 largest geothermal power plant of 2 in Nicaragua by capacity.

Nicaragua has 2 geothermal power plants in this dataset, together about 159 MW of capacity.

Nearby power plants

Location

Coordinates 12.6088, -86.773 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is San Jacinto-Tizate Geothermal Power Plant Nicaragua?

San Jacinto-Tizate Geothermal Power Plant Nicaragua is a 82 MW geothermal power plant in Leon, Nicaragua.

Built from open public data; no personal information. Operate this site? Request a correction or removal.