Gas power plant in Emirate of Abu Dhabi, United Arab Emirates. Approximate location 24.102183, 52.748485.

GasEmirate of Abu DhabiUnited Arab EmiratesEngineConstruction

Ruwais LNG Facilities power station is a 75 MW gas power plant in Emirate of Abu Dhabi, United Arab Emirates. It is operated by Abu Dhabi National Oil Co. Based on its capacity (estimated), it can supply roughly 84k homes (estimated). It ranks #55 of 60 United Arab Emirates power plants by installed capacity. In context, gas supplies about 68.3% of United Arab Emirates's electricity; the national grid averages 468 gCO₂/kWh (31.7% low-carbon) (2024).

75MW installed capacity
84,471homes powered (est.)
2028Construction

Plant data: WRI Global Power Plant Database (CC BY 4.0), id GOGPT_ruwaislngfacilities_united.

Data status

Known data

FacilityRuwais LNG Facilities power station GEM-GOGPT
CountryUnited Arab Emirates · Emirate of Abu Dhabi GEM-GOGPT
Coordinates24.102183, 52.748485 GEM-GOGPT
FuelGas GEM-GOGPT
MW installed capacity75 MW GEM GOGPT; source record
OwnerAbu Dhabi National Oil Co GEM-GOGPT
Commissioned2028 GEM-GOGPT
TechnologyEngine GEM-GOGPT

Calculated from dataset

CO₂ emissions118,260 t CO₂·a⁻¹ calculated
Capacity rank in country#55 / 60 calculated
Fuel-specific rank in country#43 / 44 calculated
Capacity vs country/fuel peers0.08× · 969 MW · n=44 calculated
Homes-powered equivalent84,471 calculated
Climate27.8°C · HDD 0 derived from coordinates
Environmental severityC5 · 65/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Capacity provenance

The public capacity above is the current source-record value. A 2026 tracker candidate lists 693 MW for Ruwais General Utilities Plant, but it is not used as the public primary value until scope is verified (unit vs operating vs installed/project total).

Data provenance

The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.

capacity: GEM GOGPT; fuel: GEM GOGPT

In context: how this plant compares

At 75 MW, Ruwais LNG Facilities power station is below the median gas plant in United Arab Emirates (969 MW). Technically it is described as Engine. Its current lifecycle status is “Construction” — so it is not yet, or no longer, generating at full output. Gas plants burn natural gas either in open-cycle turbines for fast peaking, or in combined-cycle units that recover exhaust heat in an HRSG to reach roughly 55–62% efficiency — the cleanest-burning fossil option.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest gas plants in United Arab Emirates

Shuweihat S1: 4,889 MW5kShuweihat …Emirates Aluminum Smelter Complex power station: 3,440 MW3kEmirates A…Al-Nouf Power Plant: 3,300 MW3kAl-Nouf Po…Emirates Global Aluminum Smelter power station: 2,718 MW3kEmirates G…Taweelah C Independent Power Producer (IPP): 2,500 MW2kTaweelah C…APC UAN: 2,430 MW2kAPC UANHassyan Clean-Coal Power Project: 2,400 MW2kHassyan Cl…Fujairah F3 Integrated Water and power plant: 2,400 MW2kFujairah F…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by Abu Dhabi National Oil Co.

Local climate & thermal context

This gas plant burns natural gas in a turbine — often in a combined-cycle setup — to generate electricity. It sits in a hot desert climate (Köppen BWh) — Northern Hemisphere, latitude 24.1°N — which shapes how much energy it can produce and how its output varies through the year.

27.8°Cannual mean temp
0heating degree-days (base 18°C)
3,581cooling degree-days (base 18°C)
21 melevation

Monthly mean temperature

J: 18 °CJF: 20 °CFM: 23 °CMA: 27 °CAM: 32 °CMJ: 34 °CJJ: 35 °CJA: 35 °CAS: 33 °CSO: 30 °CON: 25 °CND: 21 °CD35 °C

This site has effectively no heating season (tropical/equatorial climate), so winter heat loss is not the driver here. The thermal concern shifts to year-round process heat and humidity/heat-driven corrosion of hot equipment.

A gas turbine here also runs ~9% below its ISO (15°C) rating at this annual mean (typical CCGT curve, estimate).

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
65/100environmental-severity index
16.8°Cseasonal temperature swing
20 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #43 largest gas power plant of 44 in United Arab Emirates by capacity.

United Arab Emirates has 44 gas power plants in this dataset, together about 57,345 MW of capacity.

Nearby power plants

Location

Coordinates 24.102183, 52.748485 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is Ruwais LNG Facilities power station?

Ruwais LNG Facilities power station is a 75 MW gas power plant in Emirate of Abu Dhabi, United Arab Emirates, Construction 2028.

How many homes can Ruwais LNG Facilities power station power?

Its output is enough to supply roughly 84,471 homes (estimated).

Who operates Ruwais LNG Facilities power station?

Ruwais LNG Facilities power station is operated by Abu Dhabi National Oil Co.

Built from open public data; no personal information. Operate this site? Request a correction or removal.