PUERTO ERRADO 2 is a 31 MW solar power plant in Murcia, Spain. It is operated by TUBO SOL PE2 S.L.. Based on its capacity (estimated), it can supply roughly 13k homes (estimated). It ranks #421 of 899 Spain power plants by installed capacity. Commissioned in 2012, it is around 14 years old — relatively modern. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, solar supplies about 21.8% of Spain's electricity; the national grid averages 154 gCO₂/kWh (74.6% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1007823.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.
capacity: GEM tracker 2026 operating-unit sum (location L100000824817); fuel: WRI source-record fuel
At 31 MW, PUERTO ERRADO 2 is well above the median solar plant in Spain (10 MW). Solar PV converts sunlight directly into electricity with no moving parts or fuel; output varies by time of day and weather, so it pairs with storage or flexible backup.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by TUBO SOL PE2 S.L..
This solar plant converts sunlight directly into electricity with photovoltaic panels. It sits in a cold semi-arid steppe climate (Köppen BSk) — Northern Hemisphere, latitude 38.3°N — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 44% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 31/100 — this site sits in the bottom third of the power plants we cover by heating degree-days.
Solar PV loses ~0.35%/°C above 25°C cell temperature — roughly 0.3% at warm-season highs here (estimate).
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a benign, low-corrosion environment (estimated ISO 9223 class C1 — Very low), with dust abrasion the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #42 largest solar power plant of 243 in Spain by capacity.
Spain has 243 solar power plants in this dataset, together about 5,166 MW of capacity.
Coordinates 38.2793, -1.601 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
PUERTO ERRADO 2 is a 31 MW source-record solar power plant in Murcia, Spain, commissioned in 2012.
Its output is enough to supply roughly 13,360 homes (estimated).
PUERTO ERRADO 2 is operated by TUBO SOL PE2 S.L..