Pubnico Point 1 / 2 — Canada
Wind power plant in Nova Scotia, Canada. Approximate location 43.603, -65.8038.
WindNova ScotiaCanadaOnshore
Pubnico Point 1 / 2 is a 30.6 MW wind power plant in Nova Scotia, Canada. It is operated by NextEra Energy Inc [100%]. Based on its capacity (estimated), it can supply roughly 26k homes (estimated). It ranks #482 of 1,210 Canada power plants by installed capacity. Commissioned in 2005, it is around 21 years old — relatively modern. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 7.9% of Canada's electricity; the national grid averages 191 gCO₂/kWh (77.0% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id CAN0008257.
Data status
Known data
Calculated from dataset
Not available
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
Data provenance
Source of the capacity and fuel values:
capacity: GEM · 2026 · L100000906566; fuel: WRI GPPD
In context: how this plant compares
At 30.6 MW, Pubnico Point 1 / 2 is well above the median wind plant in Canada (24 MW). Technically it is described as Onshore. Wind turbines convert moving air into electricity; output is variable and site-dependent, and modern turbines deliver some of the lowest-cost new generation on many grids.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Key facts
- Share of Canada wind capacity
- 0.3% of 12,127 MW across 241 plants in this dataset
- Age among peers
- 7 of 127 dated wind plants in Canada are older
Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).
Capacity vs largest wind plants in Canada
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Owner
Operated by NextEra Energy Inc [100%].
Local climate & thermal context
This wind plant converts the kinetic energy of wind into electricity through turbine rotors. It sits in a temperate oceanic climate (Köppen Cfb) — Northern Hemisphere, latitude 43.6°N — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 68% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 86/100 — this site sits in the top third of the power plants we cover by heating degree-days.
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
Site climate & environmental severity
This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby plants
The #103 largest wind power plant of 241 in Canada by capacity.
Canada has 241 wind power plants in this dataset, together about 12,127 MW of capacity.
Nearby power plants
- Barrington (Watts Wind II) · Wind · 3.2 MW · Nova Scotia
- Wedgeport (Watts Wind II) · Wind · 1.6 MW · Nova Scotia
- Black Pond · Wind · 2 MW · Nova Scotia
- Little River Harbour · Wind · 2 MW · Nova Scotia
- Tusket · Hydro · 2.7 MW · Nova Scotia
- Roseway · Hydro · 2 MW · Nova Scotia
Location
Coordinates 43.603, -65.8038 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Frequently asked questions
What type of power plant is Pubnico Point 1 / 2?
Pubnico Point 1 / 2 is a 30.6 MW wind power plant in Nova Scotia, Canada, commissioned in 2005.
Who operates Pubnico Point 1 / 2?
Pubnico Point 1 / 2 is operated by NextEra Energy Inc [100%].