Coal power plant in Ustecky, Czech Republic. Approximate location 50.4278, 13.6777.
CoalUsteckyCzech RepublicsubcriticalCO₂ measured
Pocerady power station is a 1,000 MW coal power station in Ustecky, Czech Republic. It is operated by CEZ Group. Based on reported annual generation of 7,122 GWh, it can supply roughly 2.0 million homes. It ranks #3 of 481 Czech Republic power plants by installed capacity. Commissioned in 1973, it is around 53 years old — an older, legacy facility. Its annual emissions of 4,094,255 t CO₂/yr (EU ETS verified (EUTL 2023)) are equivalent to about 954k cars driven for a year. In context, coal supplies about 35.2% of Czech Republic's electricity; the national grid averages 401 gCO₂/kWh (59.2% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1019168.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.
capacity: GEM tracker 2026 (location L100000101804); fuel: WRI source-record fuel
At 1,000 MW, Pocerady power station is well above the median coal plant in Czech Republic (165 MW). Technically it is described as subcritical. Coal plants burn pulverised coal to raise high-pressure steam for a turbine; they run as baseload but are the most carbon-intensive mainstream source and the first targeted for retirement or efficiency retrofits.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
This facility's annual emissions are roughly equivalent to:
Equivalencies via US EPA Greenhouse Gas Equivalencies; emissions per EU ETS verified (EUTL 2023) (measured for US EPA/EU ETS, modelled for Climate TRACE).
Annual generation (GWh), WRI Global Power Plant Database (CC BY 4.0).
Operated by CEZ Group. All plants by this company →
This coal plant burns coal to raise high-pressure steam that spins a turbine-generator. It sits in a temperate oceanic climate (Köppen Cfb) — Northern Hemisphere, latitude 50.4°N — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 35% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 71/100 — this site sits in the top third of the power plants we cover by heating degree-days.
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #1 largest coal power plant of 32 in Czech Republic by capacity.
Czech Republic has 32 coal power plants in this dataset, together about 9,811 MW of capacity.
Coordinates 50.4278, 13.6777 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Pocerady power station is a 1,000 MW source-record coal power plant in Ustecky, Czech Republic, commissioned in 1973.
Pocerady power station generates about 7,122 GWh of electricity per year.
Its output is enough to supply roughly 2,035,000 homes.
Pocerady power station is operated by CEZ Group.
Pocerady power station has measured emissions of about 4,094,255 tonnes of CO₂ per year (EU ETS verified (EUTL 2023)).