PLTG Tarakan is a 23 MW gas power plant in North Kalimantan, Indonesia. It ranks #367 of 401 Indonesia power plants by installed capacity. In context, gas supplies about 18.5% of Indonesia's electricity; the national grid averages 680 gCO₂/kWh (18.1% low-carbon) (2024).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1000858.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.
capacity: WRI GPPD; fuel: WRI GPPD
At 23 MW, PLTG Tarakan is below the median gas plant in Indonesia (150 MW). Technically it is described as Engine. Its current lifecycle status is “Announced” — so it is not yet, or no longer, generating at full output. Gas plants burn natural gas either in open-cycle turbines for fast peaking, or in combined-cycle units that recover exhaust heat in an HRSG to reach roughly 55–62% efficiency — the cleanest-burning fossil option.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
The #132 largest gas power plant of 138 in Indonesia by capacity.
Indonesia has 138 gas power plants in this dataset, together about 44,657 MW of capacity.
Coordinates 3.3, 117.6333 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
PLTG Tarakan is a 23 MW gas power plant in North Kalimantan, Indonesia, Announced 2027.