Home / South America / Uruguay / PARQUE EÓLICO CARAPÉ I

PARQUE EÓLICO CARAPÉ I — Uruguay

Wind power plant in Maldonado, Uruguay. Approximate location -34.395, -54.6951.

WindMaldonadoUruguayOnshore

PARQUE EÓLICO CARAPÉ I is a 51 MW wind power plant in Maldonado, Uruguay. It is operated by Cubico Sustainable Investments. Based on its capacity (estimated), it can supply roughly 43k homes (estimated). It ranks #19 of 73 Uruguay power plants by installed capacity. Commissioned in 2015, it is around 11 years old — relatively modern. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 40.6% of Uruguay's electricity; the national grid averages 80 gCO₂/kWh (97.8% low-carbon) (2025).

51MW installed capacity
43,399homes powered (est.)
2015commissioned (~11 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id URY0000788.

Data status

Known data

FacilityPARQUE EÓLICO CARAPÉ I WRI
CountryUruguay · Maldonado WRI
Coordinates-34.395, -54.6951 WRI
FuelWind WRI
MW installed capacity51 MW WRI GPPD; source record
OwnerCubico Sustainable Investments WRI
Commissioned2015 WRI
TechnologyOnshore WRI

Calculated from dataset

Capacity rank in country#19 / 73 calculated
Fuel-specific rank in country#8 / 39 calculated
Capacity vs country/fuel peers1.21× · 42 MW · n=39 calculated
Homes-powered equivalent43,399 calculated
Climate15.5°C · HDD 1,209 derived from coordinates
Environmental severityC4 · 39/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

Capacity and fuel are the upstream open-dataset record, not yet matched to a 2026 registry or GEM entry.

capacity: WRI GPPD; fuel: WRI GPPD

In context: how this plant compares

At 51 MW, PARQUE EÓLICO CARAPÉ I is well above the median wind plant in Uruguay (42 MW). Technically it is described as Onshore. Wind turbines convert moving air into electricity; output is variable and site-dependent, and modern turbines deliver some of the lowest-cost new generation on many grids.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Key facts

Share of Uruguay wind capacity
3.7% of 1,382 MW across 39 plants in this dataset
Age among peers
11 of 19 dated wind plants in Uruguay are older

Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).

Capacity vs largest wind plants in Uruguay

PAMPA: 142 MW142PAMPACOLONIA ARIAS: 70 MW70COLONIA AR…VALENTINES: 70 MW70VALENTINESJUAN PABLO TERRA: 67 MW67JUAN PABLO…PARQUE EÓLICO ARTILLEROS: 65 MW65PARQUE EÓL…PERALTA I GCEE: 59 MW59PERALTA I …PERALTA II GCEE: 59 MW59PERALTA II…PARQUE EÓLICO CARAPÉ I: 51 MW51PARQUE EÓL…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by Cubico Sustainable Investments.

Local climate & thermal context

This wind plant converts the kinetic energy of wind into electricity through turbine rotors. It sits in a humid subtropical climate (Köppen Cfa) — Southern Hemisphere, latitude 34.4°S — which shapes how much energy it can produce and how its output varies through the year.

15.5°Cannual mean temp
1,209heating degree-days (base 18°C)
273cooling degree-days (base 18°C)
217 melevation

Monthly mean temperature

J: 21 °CJF: 21 °CFM: 20 °CMA: 16 °CAM: 13 °CMJ: 10 °CJJ: 10 °CJA: 11 °CAS: 12 °CSO: 15 °CON: 17 °CND: 20 °CD21 °C

Heating degree-days here run 51% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 29/100 — this site sits in the bottom third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
39/100environmental-severity index
11.2°Cseasonal temperature swing
39 kmdistance to coast

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #8 largest wind power plant of 39 in Uruguay by capacity.

Uruguay has 39 wind power plants in this dataset, together about 1,382 MW of capacity.

Nearby power plants

Location

Coordinates -34.395, -54.6951 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is PARQUE EÓLICO CARAPÉ I?

PARQUE EÓLICO CARAPÉ I is a 51 MW wind power plant in Maldonado, Uruguay, commissioned in 2015.

Who operates PARQUE EÓLICO CARAPÉ I?

PARQUE EÓLICO CARAPÉ I is operated by Cubico Sustainable Investments.

Built from open public data; no personal information. Operate this site? Request a correction or removal.