Home / Europe / Spain / PARQUE EOLICO PUNTAZA DE REMOLINOS

PARQUE EOLICO PUNTAZA DE REMOLINOS

Wind power plant in Aragon, Spain. Approximate location 41.8395, -1.1777.

WindAragonSpainOnshorePre Construction

PARQUE EOLICO PUNTAZA DE REMOLINOS is a 25 MW wind power plant in Aragon, Spain. It is operated by COMPANIA EOLICA ARAGONESA S.A.. Based on its capacity (estimated), it can supply roughly 21k homes (estimated). It ranks #496 of 899 Spain power plants by installed capacity. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 20.4% of Spain's electricity; the national grid averages 154 gCO₂/kWh (74.6% low-carbon) (2025).

25Legacy source-record capacity
21,189homes powered (est.)
2019Pre Construction year

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1007616.

Data status

Known data

FacilityPARQUE EOLICO PUNTAZA DE REMOLINOS WRI
CountrySpain · Aragon WRI
Coordinates41.8395, -1.1777 WRI
FuelWind WRI
MW installed capacity25 MW WRI source record; scope not independently normalised
OwnerCOMPANIA EOLICA ARAGONESA S.A. WRI
Commissioned2019 WRI
TechnologyOnshore WRI

Calculated from dataset

Capacity rank in country#496 of 899 calculated
Fuel-specific rank in country#208 of 341 calculated
Capacity vs country/fuel peers0.83× · 30 MW median · 341 peers calculated
Homes-powered equivalent21,189 calculated
Climate14.7°C · HDD 1,706 derived from coordinates
Environmental severityC1 · 35/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Capacity provenance

The public capacity above is the current source-record value. A 2026 tracker candidate lists 12 MW for Puntaza De Remolinos wind farm, but it is not used as the public primary value until scope is verified (unit vs operating vs installed/project total).

Capacity claim grade: B_SCOPE_PARENT_COMPLEX - recommended action: build_parent_complex_model - confidence: not_comparable_without_scope. This follows a claim-based data model: value + scope + source + confidence, rather than silently overwriting records.

Data provenance

The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.

capacity: WRI Global Power Plant Database source-record (legacy); fuel: WRI source-record fuel

In context: how this plant compares

At 25 MW, PARQUE EOLICO PUNTAZA DE REMOLINOS is below the median wind plant in Spain (30 MW). Technically it is described as Onshore. Its current lifecycle status is “pre construction” — so it is not yet, or no longer, generating at full output. Wind turbines convert moving air into electricity; output is variable and site-dependent, and modern turbines deliver some of the lowest-cost new generation on many grids.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest wind plants in Spain

SAN LORENZO A: 150 MW150SAN LORENZ…P.E. DOLAR 1: 100 MW100P.E. DOLAR…P.E. TORRE MIRO II: 99 MW99P.E. TORRE…PARAMO DE POZA I: 97 MW97PARAMO DE …PARQUE EOLICO ALTO PALANCIA III: 94 MW94PARQUE EOL…P.E. TARDIENTA I: 94 MW94P.E. TARDI…PENAFLOR III: 90 MW90PENAFLOR I…P.E. SAN JUAN DE BARGAS (UNIFICADO): 90 MW90P.E. SAN J…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by COMPANIA EOLICA ARAGONESA S.A..

Local climate & thermal context

This wind plant converts the kinetic energy of wind into electricity through turbine rotors. It sits in a cold semi-arid steppe climate (Köppen BSk) — Northern Hemisphere, latitude 41.8°N — which shapes how much energy it can produce and how its output varies through the year.

14.7°Cannual mean temp
1,706heating degree-days (base 18°C)
528cooling degree-days (base 18°C)
266 melevation

Monthly mean temperature

J: 6 °CJF: 8 °CFM: 11 °CMA: 13 °CAM: 17 °CMJ: 21 °CJJ: 24 °CJA: 24 °CAS: 20 °CSO: 15 °CON: 10 °CND: 7 °CD24 °C

Heating degree-days here run 31% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 38/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a benign, low-corrosion environment (estimated ISO 9223 class C1 — Very low), with dust abrasion the leading environmental stress.

C1ISO 9223 corrosivity (indicative)
35/100environmental-severity index
17.6°Cseasonal temperature swing
172 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #208 largest wind power plant of 341 in Spain by capacity.

Spain has 341 wind power plants in this dataset, together about 11,361 MW of capacity.

Nearby power plants

Location

Coordinates 41.8395, -1.1777 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is PARQUE EOLICO PUNTAZA DE REMOLINOS?

PARQUE EOLICO PUNTAZA DE REMOLINOS is a 25 MW source-record wind power plant in Aragon, Spain, planned/announced for 2019.

How many homes can PARQUE EOLICO PUNTAZA DE REMOLINOS power?

Its output is enough to supply roughly 21,189 homes (estimated).

Who operates PARQUE EOLICO PUNTAZA DE REMOLINOS?

PARQUE EOLICO PUNTAZA DE REMOLINOS is operated by COMPANIA EOLICA ARAGONESA S.A..