PARQUE EOLICO MONTES DE CIERZO I is a 59.5 MW wind power plant in Navarre, Spain. It is operated by EOLICA MONTES DEL CIERZO S.L.. Based on its capacity (estimated), it can supply roughly 51k homes (estimated). It ranks #196 of 899 Spain power plants by installed capacity. Commissioned in 2000, it is around 26 years old — long-established. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 20.4% of Spain's electricity; the national grid averages 154 gCO₂/kWh (74.6% low-carbon) (2025).

59.5MW installed capacity
50,632homes powered (est.)
2000commissioned (~26 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1007575.

Data status

Known data

FacilityPARQUE EOLICO MONTES DE CIERZO I WRI
CountrySpain · Navarre WRI
Coordinates42.0617, -1.6045 WRI
FuelWind WRI
MW installed capacity59.5 MW GEM · 2026 · L100000913140; part of a generating complex
Verification noteQuality label backfilled from existing source-backed capacity provenance on 2026-07-05; capacity value was not changed. source-verified
OwnerEOLICA MONTES DEL CIERZO S.L. WRI
Commissioned2000 WRI
TechnologyOnshore WRI

Calculated from dataset

Capacity rank in country#196 / 899 calculated
Fuel-specific rank in country#21 / 341 calculated
Capacity vs country/fuel peers1.98× · 30 MW · n=341 calculated
Homes-powered equivalent50,632 calculated
Climate13.5°C · HDD 1,976 derived from coordinates
Environmental severityC3 · 34/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

Source of the capacity and fuel values:

capacity: GEM · 2026 · L100000913140; fuel: WRI GPPD

In context: how this plant compares

At 59.5 MW, PARQUE EOLICO MONTES DE CIERZO I is well above the median wind plant in Spain (30 MW). Technically it is described as Onshore. Wind turbines convert moving air into electricity; output is variable and site-dependent, and modern turbines deliver some of the lowest-cost new generation on many grids.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Key facts

Share of Spain wind capacity
0.5% of 11,361 MW across 341 plants in this dataset
Age among peers
15 of 252 dated wind plants in Spain are older

Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).

Capacity vs largest wind plants in Spain

SAN LORENZO A: 150 MW150SAN LORENZ…P.E. DOLAR 1: 100 MW100P.E. DOLAR…P.E. TORRE MIRO II: 99 MW99P.E. TORRE…PARAMO DE POZA I: 97 MW97PARAMO DE …PARQUE EOLICO ALTO PALANCIA III: 94 MW94PARQUE EOL…P.E. TARDIENTA I: 94 MW94P.E. TARDI…PENAFLOR III: 90 MW90PENAFLOR I…P.E. SAN JUAN DE BARGAS (UNIFICADO): 90 MW90P.E. SAN J…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by EOLICA MONTES DEL CIERZO S.L..

Local climate & thermal context

This wind plant converts the kinetic energy of wind into electricity through turbine rotors. It sits in a humid subtropical climate (Köppen Cfa) — Northern Hemisphere, latitude 42.1°N — which shapes how much energy it can produce and how its output varies through the year.

13.5°Cannual mean temp
1,976heating degree-days (base 18°C)
356cooling degree-days (base 18°C)
452 melevation

Monthly mean temperature

J: 6 °CJF: 7 °CFM: 10 °CMA: 11 °CAM: 15 °CMJ: 19 °CJJ: 22 °CJA: 23 °CAS: 19 °CSO: 14 °CON: 9 °CND: 6 °CD23 °C

Heating degree-days here run 20% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 43/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.

C3ISO 9223 corrosivity (indicative)
34/100environmental-severity index
17.1°Cseasonal temperature swing
138 kmdistance to coast

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #21 largest wind power plant of 341 in Spain by capacity.

Spain has 341 wind power plants in this dataset, together about 11,361 MW of capacity.

Nearby power plants

Location

Coordinates 42.0617, -1.6045 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is PARQUE EOLICO MONTES DE CIERZO I?

PARQUE EOLICO MONTES DE CIERZO I is a 59.5 MW wind power plant in Navarre, Spain, commissioned in 2000.

Who operates PARQUE EOLICO MONTES DE CIERZO I?

PARQUE EOLICO MONTES DE CIERZO I is operated by EOLICA MONTES DEL CIERZO S.L..

Built from open public data; no personal information. Operate this site? Request a correction or removal.