PARQUE EOLICO LOMILLA II is a 70 MW wind power plant in Castille-La Mancha, Spain. It is operated by EOLICA MONTANESA S.L.. Based on its capacity (estimated), it can supply roughly 59,993 homes (estimated). It ranks #151 of 872 Spain power plants by installed capacity. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 20.4% of Spain's electricity; the national grid averages 154 gCO₂/kWh (74.6% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1007530.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by EOLICA MONTANESA S.L.. All plants by this company →
This wind plant converts the kinetic energy of wind into electricity through turbine rotors. It sits in a hot-summer Mediterranean climate (Köppen Csa) — Northern Hemisphere, latitude 39.5°N — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 19% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 43/100 — this site sits in the mid third of the power plants we cover by heating degree-days.
In colder climates, uninsulated hot equipment (boilers, turbines, valves, steam lines) loses proportionally more heat to ambient air — exactly the loss Inzonex modular insulation is designed to cut.
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
The #12 largest wind power plant of 342 in Spain by capacity.
Spain has 342 wind power plants in this dataset, together about 11,337 MW of capacity.
Coordinates 39.486, -2.2028 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.