Home / Europe / Spain / PARQUE EOLICO CERRO DE LA NEVERA

PARQUE EOLICO CERRO DE LA NEVERA

Wind power plant in Valencia, Spain. Approximate location 39.8833, -0.95.

WindValenciaSpainOnshore

PARQUE EOLICO CERRO DE LA NEVERA is a 32 MW wind power plant in Valencia, Spain. It is operated by ENERGIAS RENOVABLES MEDITERRANEAS S.A.. Based on its capacity (estimated), it can supply roughly 27k homes (estimated). It ranks #416 of 899 Spain power plants by installed capacity. Commissioned in 2009, it is around 17 years old — relatively modern. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 20.4% of Spain's electricity; the national grid averages 154 gCO₂/kWh (74.6% low-carbon) (2025).

32Source-backed capacity
26,805homes powered (est.)
2009commissioned (~17 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1007352.

Data status

Known data

FacilityPARQUE EOLICO CERRO DE LA NEVERA WRI
CountrySpain · Valencia WRI
Coordinates39.8833, -0.95 WRI
FuelWind WRI
MW installed capacity32 MW WRI source record; scope not independently normalised
OwnerENERGIAS RENOVABLES MEDITERRANEAS S.A. WRI
Commissioned2009 WRI
TechnologyOnshore WRI

Calculated from dataset

Capacity rank in country#416 of 899 calculated
Fuel-specific rank in country#151 of 341 calculated
Capacity vs country/fuel peers1.05× · 30 MW median · 341 peers calculated
Homes-powered equivalent26,805 calculated
Climate13.7°C · HDD 1,955 derived from coordinates
Environmental severityC4 · 39/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.

capacity: GEM tracker 2026 (location L100000913494); fuel: WRI source-record fuel

In context: how this plant compares

At 32 MW, PARQUE EOLICO CERRO DE LA NEVERA is around the median wind plant in Spain (30 MW). Technically it is described as Onshore. Wind turbines convert moving air into electricity; output is variable and site-dependent, and modern turbines deliver some of the lowest-cost new generation on many grids.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest wind plants in Spain

SAN LORENZO A: 150 MW150SAN LORENZ…P.E. DOLAR 1: 100 MW100P.E. DOLAR…P.E. TORRE MIRO II: 99 MW99P.E. TORRE…PARAMO DE POZA I: 97 MW97PARAMO DE …PARQUE EOLICO ALTO PALANCIA III: 94 MW94PARQUE EOL…P.E. TARDIENTA I: 94 MW94P.E. TARDI…PENAFLOR III: 90 MW90PENAFLOR I…P.E. SAN JUAN DE BARGAS (UNIFICADO): 90 MW90P.E. SAN J…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by ENERGIAS RENOVABLES MEDITERRANEAS S.A..

Local climate & thermal context

This wind plant converts the kinetic energy of wind into electricity through turbine rotors. It sits in a hot-summer Mediterranean climate (Köppen Csa) — Northern Hemisphere, latitude 39.9°N — which shapes how much energy it can produce and how its output varies through the year.

13.7°Cannual mean temp
1,955heating degree-days (base 18°C)
392cooling degree-days (base 18°C)
680 melevation

Monthly mean temperature

J: 6 °CJF: 7 °CFM: 9 °CMA: 11 °CAM: 15 °CMJ: 20 °CJJ: 23 °CJA: 23 °CAS: 19 °CSO: 14 °CON: 10 °CND: 7 °CD23 °C

Heating degree-days here run 20% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 42/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with marine corrosion the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
39/100environmental-severity index
16.9°Cseasonal temperature swing
44 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #151 largest wind power plant of 341 in Spain by capacity.

Spain has 341 wind power plants in this dataset, together about 11,361 MW of capacity.

Nearby power plants

Location

Coordinates 39.8833, -0.95 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is PARQUE EOLICO CERRO DE LA NEVERA?

PARQUE EOLICO CERRO DE LA NEVERA is a 32 MW source-record wind power plant in Valencia, Spain, commissioned in 2009.

How many homes can PARQUE EOLICO CERRO DE LA NEVERA power?

Its output is enough to supply roughly 26,805 homes (estimated).

Who operates PARQUE EOLICO CERRO DE LA NEVERA?

PARQUE EOLICO CERRO DE LA NEVERA is operated by ENERGIAS RENOVABLES MEDITERRANEAS S.A..

Built from open public data; no personal information. Operate this site? Request a correction or removal.