Home / Europe / Spain / P. E. DE MONTOUTO

P. E. DE MONTOUTO

Wind power plant in Galicia, Spain. Approximate location 43.3, -7.6833.

WindGaliciaSpainOnshore

P. E. DE MONTOUTO is a 20 MW wind power plant in Galicia, Spain. It is operated by NORVENTO MONTOUTO S.L.. Based on its capacity (estimated), it can supply roughly 17k homes (estimated). It ranks #572 of 899 Spain power plants by installed capacity. Commissioned in 2001, it is around 25 years old — relatively modern. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 20.4% of Spain's electricity; the national grid averages 154 gCO₂/kWh (74.6% low-carbon) (2025).

20Source-backed capacity
17,444homes powered (est.)
2001commissioned (~25 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1006780.

Data status

Known data

FacilityP. E. DE MONTOUTO WRI
CountrySpain · Galicia WRI
Coordinates43.3, -7.6833 WRI
FuelWind WRI
MW installed capacity20 MW WRI source record; scope not independently normalised
OwnerNORVENTO MONTOUTO S.L. WRI
Commissioned2001 WRI
TechnologyOnshore WRI

Calculated from dataset

Capacity rank in country#572 of 899 calculated
Fuel-specific rank in country#253 of 341 calculated
Capacity vs country/fuel peers0.68× · 30 MW median · 341 peers calculated
Homes-powered equivalent17,444 calculated
Climate12.2°C · HDD 2,117 derived from coordinates
Environmental severityC3 · 27/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.

capacity: GEM tracker 2026 (location L100000911903); fuel: WRI source-record fuel

In context: how this plant compares

At 20 MW, P. E. DE MONTOUTO is below the median wind plant in Spain (30 MW). Technically it is described as Onshore. Wind turbines convert moving air into electricity; output is variable and site-dependent, and modern turbines deliver some of the lowest-cost new generation on many grids.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest wind plants in Spain

SAN LORENZO A: 150 MW150SAN LORENZ…P.E. DOLAR 1: 100 MW100P.E. DOLAR…P.E. TORRE MIRO II: 99 MW99P.E. TORRE…PARAMO DE POZA I: 97 MW97PARAMO DE …PARQUE EOLICO ALTO PALANCIA III: 94 MW94PARQUE EOL…P.E. TARDIENTA I: 94 MW94P.E. TARDI…PENAFLOR III: 90 MW90PENAFLOR I…P.E. SAN JUAN DE BARGAS (UNIFICADO): 90 MW90P.E. SAN J…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by NORVENTO MONTOUTO S.L..

Local climate & thermal context

This wind plant converts the kinetic energy of wind into electricity through turbine rotors. It sits in a warm-summer Mediterranean climate (Köppen Csb) — Northern Hemisphere, latitude 43.3°N — which shapes how much energy it can produce and how its output varies through the year.

12.2°Cannual mean temp
2,117heating degree-days (base 18°C)
18cooling degree-days (base 18°C)
434 melevation

Monthly mean temperature

J: 7 °CJF: 8 °CFM: 9 °CMA: 10 °CAM: 13 °CMJ: 16 °CJJ: 18 °CJA: 18 °CAS: 17 °CSO: 13 °CON: 10 °CND: 8 °CD18 °C

Heating degree-days here run 14% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 45/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.

C3ISO 9223 corrosivity (indicative)
27/100environmental-severity index
11.5°Cseasonal temperature swing
50 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #253 largest wind power plant of 341 in Spain by capacity.

Spain has 341 wind power plants in this dataset, together about 11,361 MW of capacity.

Nearby power plants

Location

Coordinates 43.3, -7.6833 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is P. E. DE MONTOUTO?

P. E. DE MONTOUTO is a 20 MW source-record wind power plant in Galicia, Spain, commissioned in 2001.

How many homes can P. E. DE MONTOUTO power?

Its output is enough to supply roughly 17,444 homes (estimated).

Who operates P. E. DE MONTOUTO?

P. E. DE MONTOUTO is operated by NORVENTO MONTOUTO S.L..

Built from open public data; no personal information. Operate this site? Request a correction or removal.