Wind power plant in Castille and Leon, Spain. Approximate location 42.5273, -3.4383.

WindCastille and LeonSpainOnshore

P.E. CERRO BLANCO is a 42 MW wind power plant in Castille and Leon, Spain. It is operated by IBERDROLA RENOVABLES CASTILLA Y LEON S.A.. Based on its capacity (estimated), it can supply roughly 36k homes (estimated). It ranks #331 of 899 Spain power plants by installed capacity. Commissioned in 2009, it is around 17 years old — relatively modern. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 20.4% of Spain's electricity; the national grid averages 154 gCO₂/kWh (74.6% low-carbon) (2025).

42Source-backed capacity
35,740homes powered (est.)
2009commissioned (~17 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1006975.

Data status

Known data

FacilityP.E. CERRO BLANCO WRI
CountrySpain · Castille and Leon WRI
Coordinates42.5273, -3.4383 WRI
FuelWind WRI
MW installed capacity42 MW WRI source record; scope not independently normalised
OwnerIBERDROLA RENOVABLES CASTILLA Y LEON S.A. WRI
Commissioned2009 WRI
TechnologyOnshore WRI

Calculated from dataset

Capacity rank in country#331 of 899 calculated
Fuel-specific rank in country#87 of 341 calculated
Capacity vs country/fuel peers1.40× · 30 MW median · 341 peers calculated
Homes-powered equivalent35,740 calculated
Climate10.3°C · HDD 2,848 derived from coordinates
Environmental severityC3 · 30/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.

capacity: GEM tracker 2026 (location L100000914337); fuel: WRI source-record fuel

In context: how this plant compares

At 42 MW, P.E. CERRO BLANCO is well above the median wind plant in Spain (30 MW). Technically it is described as Onshore. Wind turbines convert moving air into electricity; output is variable and site-dependent, and modern turbines deliver some of the lowest-cost new generation on many grids.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest wind plants in Spain

SAN LORENZO A: 150 MW150SAN LORENZ…P.E. DOLAR 1: 100 MW100P.E. DOLAR…P.E. TORRE MIRO II: 99 MW99P.E. TORRE…PARAMO DE POZA I: 97 MW97PARAMO DE …PARQUE EOLICO ALTO PALANCIA III: 94 MW94PARQUE EOL…P.E. TARDIENTA I: 94 MW94P.E. TARDI…PENAFLOR III: 90 MW90PENAFLOR I…P.E. SAN JUAN DE BARGAS (UNIFICADO): 90 MW90P.E. SAN J…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by IBERDROLA RENOVABLES CASTILLA Y LEON S.A..

Local climate & thermal context

This wind plant converts the kinetic energy of wind into electricity through turbine rotors. It sits in a temperate oceanic climate (Köppen Cfb) — Northern Hemisphere, latitude 42.5°N — which shapes how much energy it can produce and how its output varies through the year.

10.3°Cannual mean temp
2,848heating degree-days (base 18°C)
65cooling degree-days (base 18°C)
976 melevation

Monthly mean temperature

J: 3 °CJF: 4 °CFM: 6 °CMA: 8 °CAM: 12 °CMJ: 16 °CJJ: 19 °CJA: 19 °CAS: 16 °CSO: 11 °CON: 6 °CND: 4 °CD19 °C

Heating degree-days here run 16% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 58/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.

C3ISO 9223 corrosivity (indicative)
30/100environmental-severity index
16.3°Cseasonal temperature swing
68 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #87 largest wind power plant of 341 in Spain by capacity.

Spain has 341 wind power plants in this dataset, together about 11,361 MW of capacity.

Nearby power plants

Location

Coordinates 42.5273, -3.4383 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is P.E. CERRO BLANCO?

P.E. CERRO BLANCO is a 42 MW source-record wind power plant in Castille and Leon, Spain, commissioned in 2009.

How many homes can P.E. CERRO BLANCO power?

Its output is enough to supply roughly 35,740 homes (estimated).

Who operates P.E. CERRO BLANCO?

P.E. CERRO BLANCO is operated by IBERDROLA RENOVABLES CASTILLA Y LEON S.A..

Built from open public data; no personal information. Operate this site? Request a correction or removal.