Onikobe

Geothermal power plant in Miyagi, Japan. Approximate location 38.8098, 140.7086.

GeothermalMiyagiJapan

Onikobe is a 15 MW geothermal power plant in Miyagi, Japan. It is operated by TOHOKU ELECTRIC POWER CO. Based on its capacity (estimated), it can supply roughly 28k homes (estimated). It ranks #495 of 692 Japan power plants by installed capacity. Commissioned in 1975, it is around 51 years old — an older, legacy facility. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, the national grid averages 477 gCO₂/kWh (32.7% low-carbon) (2025).

15Legacy source-record capacity
28,157homes powered (est.)
1975commissioned (~51 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1020122.

Data status

Known data

FacilityOnikobe WRI
CountryJapan · Miyagi WRI
Coordinates38.8098, 140.7086 WRI
FuelGeothermal WRI
MW installed capacity15 MW WRI source record; scope not independently normalised
OwnerTOHOKU ELECTRIC POWER CO WRI
Commissioned1975 WRI

Calculated from dataset

Capacity rank in country#495 of 692 calculated
Fuel-specific rank in country#11 of 14 calculated
Capacity vs country/fuel peers0.50× · 30 MW median · 14 peers calculated
Homes-powered equivalent28,157 calculated
Climate9.5°C · HDD 3,308 derived from coordinates
Environmental severityC3 · 36/100 derived from coordinates

Not available

TechnologyNot available not in dataset
GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.

capacity: WRI Global Power Plant Database source-record (legacy); fuel: WRI source-record fuel

In context: how this plant compares

At 15 MW, Onikobe is below the median geothermal plant in Japan (30 MW). Geothermal plants tap underground heat to raise steam for a turbine; they provide steady, low-carbon baseload but are limited to geologically active regions.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest geothermal plants in Japan

Hatchobaru Otake: 110 MW110Hatchobaru…Kakkonda: 80 MW80KakkondaYanaizu-Nishiyama: 65 MW65Yanaizu-Ni…Mori: 50 MW50MoriSumikawa Akita: 50 MW50Sumikawa A…Ogiri: 35 MW35OgiriYamagawa: 30 MW30YamagawaUenotai: 28 MW28Uenotai

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by TOHOKU ELECTRIC POWER CO. All plants by this company →

Local climate & thermal context

This geothermal plant taps underground heat to raise steam that drives a turbine. It sits in a humid subtropical climate (Köppen Cfa) — Northern Hemisphere, latitude 38.8°N — which shapes how much energy it can produce and how its output varies through the year.

9.5°Cannual mean temp
3,308heating degree-days (base 18°C)
245cooling degree-days (base 18°C)
350 melevation

Monthly mean temperature

J: -2 °CJF: -2 °CFM: 1 °CMA: 7 °CAM: 13 °CMJ: 17 °CJJ: 21 °CJA: 23 °CAS: 18 °CSO: 12 °CON: 6 °CND: 1 °CD23 °C

Heating degree-days here run 35% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 71/100 — this site sits in the top third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.

C3ISO 9223 corrosivity (indicative)
36/100environmental-severity index
24.8°Cseasonal temperature swing
78 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #11 largest geothermal power plant of 14 in Japan by capacity.

Japan has 14 geothermal power plants in this dataset, together about 536 MW of capacity.

Nearby power plants

Location

Coordinates 38.8098, 140.7086 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is Onikobe?

Onikobe is a 15 MW source-record geothermal power plant in Miyagi, Japan, commissioned in 1975.

How many homes can Onikobe power?

Its output is enough to supply roughly 28,157 homes (estimated).

Who operates Onikobe?

Onikobe is operated by TOHOKU ELECTRIC POWER CO.