Oil power plant in Ceara, Brazil. Approximate location -3.7817, -38.5182.
OilCearaBrazil
North Shopping Jóquei is a 3 MW oil power plant in Ceara, Brazil. Based on its capacity (estimated), it can supply roughly 2,252 homes (estimated). It ranks #1937 of 2,613 Brazil power plants by installed capacity. Commissioned in 2013, it is around 13 years old — relatively modern. In context, oil supplies about 1.7% of Brazil's electricity; the national grid averages 110 gCO₂/kWh (88.7% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id BRA0031322.
At 3 MW, North Shopping Jóquei is well above the median oil plant in Brazil (2 MW). Oil-fired plants burn heavy fuel oil or diesel, usually as peaking or backup capacity on islands and grids without gas pipelines; high fuel cost keeps their utilisation low.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
This facility's annual emissions are roughly equivalent to:
Estimated, not measured: from installed capacity at a typical 30% load factor × a typical oil emission factor (~750 g CO₂/kWh, IPCC AR5 / US EIA). Actual emissions depend on plant efficiency and running hours.Equivalencies via US EPA Greenhouse Gas Equivalencies.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
This oil plant burns oil or diesel to drive turbines or reciprocating engines. It sits in a tropical savanna climate (Köppen As) — Southern Hemisphere, latitude 3.8°S — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 100% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 13/100 — this site sits in the bottom third of the power plants we cover by heating degree-days.
In colder climates, uninsulated hot equipment (boilers, turbines, valves, steam lines) loses proportionally more heat to ambient air — exactly the loss Inzonex modular insulation is designed to cut.
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
The #263 largest oil power plant of 645 in Brazil by capacity.
Brazil has 645 oil power plants in this dataset, together about 11,207 MW of capacity.
↳ Estimate the heat-loss and CO₂ savings from insulating the hot boiler-house and steam equipment at a thermal plant like this with the insulation savings calculator.
Coordinates -3.7817, -38.5182 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Plants like this lose energy through hot boilers, economizers, superheaters, valves and headers. Inzonex makes removable, reusable boiler & economizer insulation that cuts that loss by up to 90% and holds surface temperatures under 45°C, unclipping in seconds for maintenance. See the industrial-AI efficiency hub for tools and benchmarks.
North Shopping Jóquei is a 3 MW oil power plant in Ceara, Brazil, commissioned in 2013.
Its output is enough to supply roughly 2,252 homes (estimated).