Ningxia Taiyangshan Jingneng Second Phase is a 49 MW wind power plant in Ningxia Huizu Zizhiqu, China. It ranks #3833 of 6,685 China power plants by installed capacity. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 10.7% of China's electricity; the national grid averages 525 gCO₂/kWh (41.7% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1072287.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The public capacity above is the current source-record value. A 2026 tracker candidate lists 150 MW for Ningxia Taiyangshan (Jingneng) wind farm, but it is not used as the public primary value until scope is verified (unit vs operating vs installed/project total).
The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.
capacity: GEM · 2026 · L100000903674; fuel: WRI GPPD
At 49 MW, Ningxia Taiyangshan Jingneng Second Phase is around the median wind plant in China (49 MW). Technically it is described as Onshore. Its current lifecycle status is “Announced” — so it is not yet, or no longer, generating at full output. Wind turbines convert moving air into electricity; output is variable and site-dependent, and modern turbines deliver some of the lowest-cost new generation on many grids.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
The #567 largest wind power plant of 835 in China by capacity.
China has 835 wind power plants in this dataset, together about 52,236 MW of capacity.
Coordinates 37.4667, 106.6 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Ningxia Taiyangshan Jingneng Second Phase is a 49 MW wind power plant in Ningxia Huizu Zizhiqu, China, Announced 2011.