Lueng Bata power station is a 58.5 MW oil power plant in Aceh, Indonesia. It is operated by PT PLN (Persero) [100%]. Based on its capacity (estimated), it can supply roughly 44k homes (estimated). It ranks #319 of 401 Indonesia power plants by installed capacity. Commissioned in 1981, it is around 45 years old — long-established. In context, oil supplies about 1.9% of Indonesia's electricity; the national grid averages 680 gCO₂/kWh (18.1% low-carbon) (2024).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id GOGPT_luengbata_indone.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.
capacity: GEM · 2026 · L100000408079; fuel: GEM GOGPT
At 58.5 MW, Lueng Bata power station is well above the median oil plant in Indonesia (50.1 MW). Technically it is described as Engine. Oil-fired plants burn heavy fuel oil or diesel, usually as peaking or backup capacity on islands and grids without gas pipelines; high fuel cost keeps their utilisation low.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by PT PLN (Persero) [100%].
This oil plant burns oil or diesel to drive turbines or reciprocating engines. It sits in a tropical rainforest climate (Köppen Af) — Northern Hemisphere, latitude 5.5°N — which shapes how much energy it can produce and how its output varies through the year.
Climate zone & typical temperatures: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #5 largest oil power plant of 18 in Indonesia by capacity.
Indonesia has 18 oil power plants in this dataset, together about 852 MW of capacity.
Coordinates 5.540313, 95.341225 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Lueng Bata power station is a 58.5 MW oil power plant in Aceh, Indonesia, commissioned in 1981.
Its output is enough to supply roughly 43,925 homes (estimated).
Lueng Bata power station is operated by PT PLN (Persero) [100%].