Lombok 2 power station is a 100 MW gas power station in West Nusa Tenggara, Indonesia. It is operated by PT PLN (Persero) [100%]. Based on its capacity (estimated), it can supply roughly 113k homes (estimated). It ranks #263 of 401 Indonesia power plants by installed capacity. In context, gas supplies about 18.5% of Indonesia's electricity; the national grid averages 680 gCO₂/kWh (18.1% low-carbon) (2024).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id GOGPT_lombok2_indone.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.
capacity: GEM GOGPT; fuel: GEM GOGPT
At 100 MW, Lombok 2 power station is below the median gas plant in Indonesia (150 MW). Its current lifecycle status is “Pre Construction” — so it is not yet, or no longer, generating at full output. Gas plants burn natural gas either in open-cycle turbines for fast peaking, or in combined-cycle units that recover exhaust heat in an HRSG to reach roughly 55–62% efficiency — the cleanest-burning fossil option.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by PT PLN (Persero) [100%].
This gas plant burns natural gas in a turbine — often in a combined-cycle setup — to generate electricity. It sits in a tropical savanna climate (Köppen Aw) — Southern Hemisphere, latitude 8.3°S — which shapes how much energy it can produce and how its output varies through the year.
Climate zone & typical temperatures: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in an extreme marine/tropical environment (estimated ISO 9223 class CX — Extreme), with marine salt corrosion the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #100 largest gas power plant of 138 in Indonesia by capacity.
Indonesia has 138 gas power plants in this dataset, together about 44,657 MW of capacity.
Coordinates -8.348033, 116.717168 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Lombok 2 power station is a 100 MW gas power plant in West Nusa Tenggara, Indonesia, Pre Construction 2026.
Its output is enough to supply roughly 112,628 homes (estimated).
Lombok 2 power station is operated by PT PLN (Persero) [100%].