Coal power plant in Naryn, Kyrgyzstan. Approximate location 41.71, 74.76.
CoalNarynKyrgyzstanAnnounced
Kara-Keche power station is a 1,200 MW coal power station in Naryn, Kyrgyzstan. It is operated by Thermal Power Stations JSC [100%]. Based on its capacity (estimated), it can supply roughly 1.5 million homes (estimated). It ranks #2 of 15 Kyrgyzstan power plants by installed capacity. In context, coal supplies about 12.6% of Kyrgyzstan's electricity; the national grid averages 153 gCO₂/kWh (84.7% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id GEM_coa_karakeche_kyrgy.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.
capacity: GEM GCPT; fuel: GEM GCPT
Its current lifecycle status is “Announced” — so it is not yet, or no longer, generating at full output. Coal plants burn pulverised coal to raise high-pressure steam for a turbine; they run as baseload but are the most carbon-intensive mainstream source and the first targeted for retirement or efficiency retrofits.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by Thermal Power Stations JSC [100%].
This coal plant burns coal to raise high-pressure steam that spins a turbine-generator. It sits in a subarctic (boreal) climate (Köppen Dfc) — Northern Hemisphere, latitude 41.7°N — which shapes how much energy it can produce and how its output varies through the year.
Climate zone & typical temperatures: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with thermal cycling the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #1 largest coal power plant of 3 in Kyrgyzstan by capacity.
Kyrgyzstan has 3 coal power plants in this dataset, together about 2,534 MW of capacity.
Coordinates 41.71, 74.76 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Kara-Keche power station is a 1,200 MW coal power plant in Naryn, Kyrgyzstan, Announced 2030.
Its output is enough to supply roughly 1,501,714 homes (estimated).
Kara-Keche power station is operated by Thermal Power Stations JSC [100%].