Nuclear power plant in Ibaraki Prefecture, Japan. Approximate location 36.4568, 140.6059.

NuclearIbaraki PrefectureJapanBWR-1boiling water reactor

Japan Power Demonstration Reactor nuclear power plant is a 13 MW nuclear power plant in Ibaraki Prefecture, Japan. It is operated by Japan Atomic Energy Agency [100%]. Based on its capacity (estimated), it can supply roughly 29k homes (estimated). It ranks #527 of 692 Japan power plants by installed capacity. Commissioned in 1965, it is around 61 years old — an older, legacy facility. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, nuclear supplies about 9.1% of Japan's electricity; the national grid averages 477 gCO₂/kWh (32.7% low-carbon) (2025).

13MW installed capacity
3construction time (1960→1963)
29,283homes powered (est.)
1965commissioned (~61 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id GEM_nuc_japandemonstrationre_japan.

Data status

Known data

FacilityJapan Power Demonstration Reactor nuclear power plant GEM-nuclear
CountryJapan · Ibaraki Prefecture GEM-nuclear
Coordinates36.4568, 140.6059 GEM-nuclear
FuelNuclear GEM-nuclear
MW installed capacity13 MW GEM GNPT; source record
OwnerJapan Atomic Energy Agency [100%] GEM-nuclear
Commissioned1965 GEM-nuclear
Technologyboiling water reactor GEM-nuclear

Calculated from dataset

Capacity rank in country#527 / 692 calculated
Fuel-specific rank in country#24 / 24 calculated
Capacity vs country/fuel peers0.01× · 2,070 MW · n=24 calculated
Homes-powered equivalent29,283 calculated
Climate12.3°C · HDD 2,415 derived from coordinates
Environmental severityC4 · 42/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.

capacity: GEM GNPT; fuel: GEM GNPT

In context: how this plant compares

At 13 MW, Japan Power Demonstration Reactor nuclear power plant is below the median nuclear plant in Japan (2,070 MW). Technically it is described as boiling water reactor. Nuclear plants split uranium to raise steam with no direct CO₂; they run as steady baseload with very high capacity factors and the longest operating lifetimes of any thermal plant.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest nuclear plants in Japan

Kashiwazaki Kariwa: 7,965 MW8kKashiwazak…Fukushima Daiichi nuclear power plant: 7,456 MW7kFukushima …Ohi: 4,710 MW5kOhiFukushima Daina: 4,400 MW4kFukushima …Hamaoka: 3,504 MW4kHamaokaGenkai: 3,478 MW3kGenkaiTakahama: 3,392 MW3kTakahamaKaminoseki nuclear power plant: 2,746 MW3kKaminoseki…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by Japan Atomic Energy Agency [100%].

Local climate & thermal context

This nuclear plant uses heat from nuclear fission to raise steam for a turbine-generator. It sits in a humid subtropical climate (Köppen Cfa) — Northern Hemisphere, latitude 36.5°N — which shapes how much energy it can produce and how its output varies through the year.

12.3°Cannual mean temp
2,415heating degree-days (base 18°C)
373cooling degree-days (base 18°C)
178 melevation

Monthly mean temperature

J: 2 °CJF: 2 °CFM: 5 °CMA: 11 °CAM: 15 °CMJ: 18 °CJJ: 22 °CJA: 24 °CAS: 20 °CSO: 15 °CON: 10 °CND: 5 °CD24 °C

Heating degree-days here run 2% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 49/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
42/100environmental-severity index
21.5°Cseasonal temperature swing
24 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #24 largest nuclear power plant of 24 in Japan by capacity.

Japan has 24 nuclear power plants in this dataset, together about 61,851 MW of capacity.

Nearby power plants

Location

Coordinates 36.4568, 140.6059 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is Japan Power Demonstration Reactor nuclear power plant?

Japan Power Demonstration Reactor nuclear power plant is a 13 MW nuclear power plant in Ibaraki Prefecture, Japan, commissioned in 1965.

How many homes can Japan Power Demonstration Reactor nuclear power plant power?

Its output is enough to supply roughly 29,283 homes (estimated).

Who operates Japan Power Demonstration Reactor nuclear power plant?

Japan Power Demonstration Reactor nuclear power plant is operated by Japan Atomic Energy Agency [100%].