Hydro power plant in Federation of Bosnia and Herzegovina, Bosnia and Herzegovina. Approximate location 44.4279, 17.2404.
HydroFederation of Bosnia and HerzegovinaBosnia and Herzegovinarun-of-river
Jajce II Hidroelektrana Bosnia and Herzegovin is a 30 MW hydro power plant in Federation of Bosnia and Herzegovina, Bosnia and Herzegovina. It is operated by Elektroprivreda HZHB Mostar dd [100%]. Based on its capacity (estimated), it can supply roughly 30k homes (estimated). It ranks #32 of 34 Bosnia and Herzegovina power plants by installed capacity. Commissioned in 1954, it is around 72 years old — an older, legacy facility. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, hydro supplies about 36.6% of Bosnia and Herzegovina's electricity; the national grid averages 571 gCO₂/kWh (43.6% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id GEODB0044813.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.
capacity: GEM tracker 2026 (location L100001054554); fuel: WRI source-record fuel
At 30 MW, Jajce II Hidroelektrana Bosnia and Herzegovin is below the median hydro plant in Bosnia and Herzegovina (114 MW). Technically it is described as run-of-river. Hydropower converts the energy of falling or flowing water into electricity; output depends on rainfall and reservoir level, and large dams also provide grid balancing and storage.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by Elektroprivreda HZHB Mostar dd [100%].
This hydro plant converts the energy of falling or flowing water through hydro turbines. It sits in a temperate oceanic climate (Köppen Cfb) — Northern Hemisphere, latitude 44.4°N — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 39% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 74/100 — this site sits in the top third of the power plants we cover by heating degree-days.
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #14 largest hydro power plant of 16 in Bosnia and Herzegovina by capacity.
Bosnia and Herzegovina has 16 hydro power plants in this dataset, together about 2,222 MW of capacity.
Coordinates 44.4279, 17.2404 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Jajce II Hidroelektrana Bosnia and Herzegovin is a 30 MW source-record hydro power plant in Federation of Bosnia and Herzegovina, Bosnia and Herzegovina, commissioned in 1954.
Its output is enough to supply roughly 30,034 homes (estimated).
Jajce II Hidroelektrana Bosnia and Herzegovin is operated by Elektroprivreda HZHB Mostar dd [100%].