Huaneng Tuokexun Baiyanghe First Stage is a 49 MW wind power plant in Xinjiang Uygur Zizhiqu, China. It ranks #3730 of 6,685 China power plants by installed capacity. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 10.7% of China's electricity; the national grid averages 525 gCO₂/kWh (41.7% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1071480.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The public capacity above is the current source-record value. A 2026 tracker candidate lists 200 MW for Xinjiang Tuokexun Baiyanghe wind farm, but it is not used as the public primary value until scope is verified (unit vs operating vs installed/project total).
The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.
capacity: GEM · 2026 · L100000903897; fuel: WRI GPPD
At 49 MW, Huaneng Tuokexun Baiyanghe First Stage is around the median wind plant in China (49 MW). Technically it is described as Onshore. Its current lifecycle status is “Pre Construction” — so it is not yet, or no longer, generating at full output. Wind turbines convert moving air into electricity; output is variable and site-dependent, and modern turbines deliver some of the lowest-cost new generation on many grids.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
The #464 largest wind power plant of 835 in China by capacity.
China has 835 wind power plants in this dataset, together about 52,236 MW of capacity.
Coordinates 43.0639, 88.595 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Huaneng Tuokexun Baiyanghe First Stage is a 49 MW wind power plant in Xinjiang Uygur Zizhiqu, China, Pre Construction 2009.