Gresik AKR Estate power station is a 500 MW gas power station in East Java, Indonesia. It is operated by PT AKR Corporindo Tbk [100%]. Based on its capacity (estimated), it can supply roughly 563k homes (estimated). It ranks #84 of 401 Indonesia power plants by installed capacity. Commissioned in 2020, it is around 6 years old — recently built. In context, gas supplies about 18.5% of Indonesia's electricity; the national grid averages 680 gCO₂/kWh (18.1% low-carbon) (2024).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id GOGPT_gresikakrestate_indone.
Data status
Known data
Calculated from dataset
Not available
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
Data provenance
Source of the capacity and fuel values:
capacity: GEM · 2026 · L100000405271; fuel: GEM GOGPT
In context: how this plant compares
At 500 MW, Gresik AKR Estate power station is well above the median gas plant in Indonesia (150 MW). Technically it is described as OCGT. Gas plants burn natural gas either in open-cycle turbines for fast peaking, or in combined-cycle units that recover exhaust heat in an HRSG to reach roughly 55–62% efficiency — the cleanest-burning fossil option.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Key facts
- Share of Indonesia gas capacity
- 1.1% of 44,657 MW across 138 plants in this dataset
- Age among peers
- 33 of 99 dated gas plants in Indonesia are older
Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).
Capacity vs largest gas plants in Indonesia
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Owner
Operated by PT AKR Corporindo Tbk [100%].
Climate zone & how it works
This gas plant burns natural gas in a turbine — often in a combined-cycle setup — to generate electricity. It sits in a tropical savanna climate (Köppen Aw) — Southern Hemisphere, latitude 7.1°S — which shapes how much energy it can produce and how its output varies through the year.
Climate zone & typical temperatures: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby plants
The #22 largest gas power plant of 138 in Indonesia by capacity.
Indonesia has 138 gas power plants in this dataset, together about 44,657 MW of capacity.
Nearby power plants
- Jawa-3 Combined Cycle power station · Gas · 800 MW · East Java
- Gresik AKR power station · Coal · 660 MW · East Java
- PLTG Gresik · Gas · 80 MW · East Java
- PLTGU Gresik · Gas · 1,579 MW · East Java
- PLTU Gresik · Coal · 600 MW · East Java
- PLTU Perak · Coal · 100 MW · East Java
Location
Coordinates -7.089043, 112.606961 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Frequently asked questions
What type of power plant is Gresik AKR Estate power station?
Gresik AKR Estate power station is a 500 MW gas power plant in East Java, Indonesia, commissioned in 2020.
Who operates Gresik AKR Estate power station?
Gresik AKR Estate power station is operated by PT AKR Corporindo Tbk [100%].
