Hydro power plant in Toshkent, Uzbekistan. Approximate location 41.5581, 69.7708.
HydroToshkentUzbekistanconventional storage
Gazalkent is a 120 MW hydro power station in Toshkent, Uzbekistan. It is operated by Uzbekenergo. Based on its capacity (estimated), it can supply roughly 120k homes (estimated). It ranks #21 of 28 Uzbekistan power plants by installed capacity. Commissioned in 1980, it is around 46 years old — long-established. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, hydro supplies about 7.3% of Uzbekistan's electricity; the national grid averages 1,000 gCO₂/kWh (19.4% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1000148.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.
capacity: GEM tracker 2026 (location L100000603975); fuel: WRI source-record fuel
At 120 MW, Gazalkent is around the median hydro plant in Uzbekistan (127 MW). Technically it is described as conventional storage. Hydropower converts the energy of falling or flowing water into electricity; output depends on rainfall and reservoir level, and large dams also provide grid balancing and storage.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by Uzbekenergo. All plants by this company →
This hydro plant converts the energy of falling or flowing water through hydro turbines. It sits in a hot-summer Mediterranean continental climate (Köppen Dsa) — Northern Hemisphere, latitude 41.6°N — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 41% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 75/100 — this site sits in the top third of the power plants we cover by heating degree-days.
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with thermal cycling the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #4 largest hydro power plant of 6 in Uzbekistan by capacity.
Uzbekistan has 6 hydro power plants in this dataset, together about 1,187 MW of capacity.
Coordinates 41.5581, 69.7708 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Gazalkent is a 120 MW source-record hydro power plant in Toshkent, Uzbekistan, commissioned in 1980.
Its output is enough to supply roughly 120,137 homes (estimated).
Gazalkent is operated by Uzbekenergo.