Home / Oceania / Australia / Darwin DRW

Darwin DRW — Australia

Solar power plant in Northern Territory, Australia. Approximate location -12.4157, 130.8908.

SolarNorthern TerritoryAustralia

Darwin DRW is a 4 MW solar power plant in Northern Territory, Australia. Based on its capacity (estimated), it can supply roughly 1.7k homes (estimated). It ranks #450 of 536 Australia power plants by installed capacity. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, solar supplies about 19.6% of Australia's electricity; the national grid averages 525 gCO₂/kWh (38.6% low-carbon) (2025).

4MW installed capacity
1,701homes powered (est.)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WKS0068285.

Data status

Known data

FacilityDarwin DRW WRI
CountryAustralia · Northern Territory WRI
Coordinates-12.4157, 130.8908 WRI
FuelSolar WRI
MW installed capacity4 MW GEM · 2026 · L100001023676; part of a generating complex
Verification noteQuality label backfilled from existing source-backed capacity provenance on 2026-07-05; capacity value was not changed. source-verified

Calculated from dataset

Capacity rank in country#450 / 536 calculated
Fuel-specific rank in country#63 / 69 calculated
Capacity vs country/fuel peers0.09× · 47 MW · n=69 calculated
Homes-powered equivalent1,701 calculated
Climate27.2°C · HDD 0 derived from coordinates
Environmental severityC5 · 50/100 derived from coordinates

Not available

OwnerNot available not in dataset
CommissionedNot available not in dataset
TechnologyNot available not in dataset
GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Capacity provenance

The public capacity above is the current source-record value. A 2026 tracker candidate lists 7 MW for Darwin City Of Darwin solar project I, but it is not used as the public primary value until scope is verified (unit vs operating vs installed/project total).

Data provenance

Source of the capacity and fuel values:

capacity: GEM · 2026 · L100001023676; fuel: WRI GPPD

In context: how this plant compares

At 4 MW, Darwin DRW is below the median solar plant in Australia (47 MW). Solar PV converts sunlight directly into electricity with no moving parts or fuel; output varies by time of day and weather, so it pairs with storage or flexible backup.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Key facts

Share of Australia solar capacity
less than 0.1% of 4,331 MW across 69 plants in this dataset

Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).

Capacity vs largest solar plants in Australia

Haughton River Solar Farm: 500 MW500Haughton R…Sunraysia: 200 MW200SunraysiaHayman Solar Farm: 180 MW180Hayman Sol…Daydream Solar Farm: 150 MW150Daydream S…Wilpena Solar Farm: 145 MW145Wilpena So…Clare Solar Farm: 128 MW128Clare Sola…Ross River: 128 MW128Ross RiverLilyvale Solar Farm: 125 MW125Lilyvale S…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Local climate & thermal context

This solar plant converts sunlight directly into electricity with photovoltaic panels. It sits in a tropical savanna climate (Köppen Aw) — Southern Hemisphere, latitude 12.4°S — which shapes how much energy it can produce and how its output varies through the year.

27.2°Cannual mean temp
0heating degree-days (base 18°C)
3,363cooling degree-days (base 18°C)
34 melevation

Monthly mean temperature

J: 28 °CJF: 28 °CFM: 28 °CMA: 28 °CAM: 26 °CMJ: 25 °CJJ: 24 °CJA: 25 °CAS: 28 °CSO: 29 °CON: 29 °CND: 29 °CD29 °C

This site has effectively no heating season (tropical/equatorial climate), so winter heat loss is not the driver here. The thermal concern shifts to year-round process heat and humidity/heat-driven corrosion of hot equipment.

Solar PV loses ~0.35%/°C above 25°C cell temperature — roughly 1.5% at warm-season highs here (estimate).

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
50/100environmental-severity index
5.3°Cseasonal temperature swing
26 kmdistance to coast

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #63 largest solar power plant of 69 in Australia by capacity.

Australia has 69 solar power plants in this dataset, together about 4,331 MW of capacity.

Nearby power plants

Location

Coordinates -12.4157, 130.8908 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is Darwin DRW?

Darwin DRW is a 4 MW solar power plant in Northern Territory, Australia.

Built from open public data; no personal information. Operate this site? Request a correction or removal.