Home / Europe / Spain / CT GUARDO 2

CT GUARDO 2 — Spain

Coal power plant in Castille and Leon, Spain. Approximate location 42.8261, -4.8463.

CoalCastille and LeonSpain

CT GUARDO 2 is a 485.9 MW coal power station in Castille and Leon, Spain. It is operated by IBERDROLA GENERACION S.A.. Based on reported annual generation of 1,103 GWh, it can supply roughly 315k homes. It ranks #62 of 899 Spain power plants by installed capacity. Commissioned in 1984, it is around 42 years old — long-established. In context, coal supplies about 0.3% of Spain's electricity; the national grid averages 154 gCO₂/kWh (74.6% low-carbon) (2025).

485.9MW installed capacity
1,103GWh reported / yr
315,171homes powered
1984commissioned (~42 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1006407.

Data status

Known data

FacilityCT GUARDO 2 WRI
CountrySpain · Castille and Leon WRI
Coordinates42.8261, -4.8463 WRI
FuelCoal WRI
MW installed capacity485.9 MW WRI GPPD; source record
OwnerIBERDROLA GENERACION S.A. WRI
Commissioned1984 WRI
GWh reported / yr1,103 GWh·a⁻¹ WRI

Calculated from dataset

CO₂ emissions1,103,100 t CO₂·a⁻¹ calculated
Capacity rank in country#62 / 899 calculated
Fuel-specific rank in country#13 / 24 calculated
Capacity vs country/fuel peers0.94× · 515.6 MW · n=24 calculated
Homes-powered equivalent315,171 calculated from reported generation
Climate9.4°C · HDD 3,111 derived from coordinates
Environmental severityC4 · 33/100 derived from coordinates

Not available

TechnologyNot available not in dataset

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

Capacity and fuel are the upstream open-dataset record, not yet matched to a 2026 registry or GEM entry.

capacity: WRI GPPD; fuel: WRI GPPD

In context: how this plant compares

At 485.9 MW, CT GUARDO 2 is around the median coal plant in Spain (515.6 MW). Coal plants burn pulverised coal to raise high-pressure steam for a turbine; they run as baseload but are the most carbon-intensive mainstream source and the first targeted for retirement or efficiency retrofits.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Key facts

Load factor
26%, from 1,103 GWh of reported generation; the median for 12 coal plants in Spain that report generation is 51%
Generation trend
1,799 GWh in 2015 and 1,103 GWh in 2017 (−39%)
Highest and lowest year
2015: 1,799 GWh; 2016: 927 GWh
Share of Spain coal capacity
3.9% of 12,360 MW across 24 plants in this dataset
Age among peers
12 of 23 dated coal plants in Spain are older

Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).

Reported generation trend

2015: 1,799 GWh20152016: 927 GWh20162017: 1,103 GWh20172k GWh

Annual generation (GWh), WRI Global Power Plant Database (CC BY 4.0).

Local climate & thermal context

This coal plant burns coal to raise high-pressure steam that spins a turbine-generator. It sits in a warm-summer Mediterranean climate (Köppen Csb) — Northern Hemisphere, latitude 42.8°N — which shapes how much energy it can produce and how its output varies through the year.

9.4°Cannual mean temp
3,111heating degree-days (base 18°C)
2cooling degree-days (base 18°C)
1,146 melevation

Monthly mean temperature

J: 2 °CJF: 3 °CFM: 6 °CMA: 7 °CAM: 11 °CMJ: 15 °CJJ: 18 °CJA: 18 °CAS: 15 °CSO: 10 °CON: 6 °CND: 3 °CD18 °C

Heating degree-days here run 27% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 66/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with marine corrosion the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
33/100environmental-severity index
16.2°Cseasonal temperature swing
47 kmdistance to coast

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #13 largest coal power plant of 24 in Spain by capacity.

Spain has 24 coal power plants in this dataset, together about 12,360 MW of capacity.

Nearby power plants

Location

Coordinates 42.8261, -4.8463 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is CT GUARDO 2?

CT GUARDO 2 is a 485.9 MW coal power plant in Castille and Leon, Spain, commissioned in 1984.

How much electricity does CT GUARDO 2 generate?

CT GUARDO 2 generates about 1,103 GWh of electricity per year.

Who operates CT GUARDO 2?

CT GUARDO 2 is operated by IBERDROLA GENERACION S.A..

Built from open public data; no personal information. Operate this site? Request a correction or removal.