Hydro power plant in Lempira, El Salvador. Approximate location 13.9908, -88.7579.
HydroLempiraEl Salvadorconventional storage
Cinco de Noviembre Hydroelectric Power Plant El Salvador is a 99 MW hydro power plant in Lempira, El Salvador. It is operated by Comisión Ejecutiva Hidroeléctrica del Río Lempa [100%]. Based on its capacity (estimated), it can supply roughly 100k homes (estimated). It ranks #10 of 19 El Salvador power plants by installed capacity. Commissioned in 1953, it is around 73 years old — an older, legacy facility. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, hydro supplies about 30.3% of El Salvador's electricity; the national grid averages 139 gCO₂/kWh (86.5% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id GEODB0043610.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.
capacity: WRI Global Power Plant Database source-record (legacy); fuel: WRI source-record fuel
Technically it is described as conventional storage. Hydropower converts the energy of falling or flowing water into electricity; output depends on rainfall and reservoir level, and large dams also provide grid balancing and storage.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by Comisión Ejecutiva Hidroeléctrica del Río Lempa [100%].
This hydro plant converts the energy of falling or flowing water through hydro turbines. It sits in a tropical savanna climate (Köppen Aw) — Northern Hemisphere, latitude 14.0°N — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
This site has effectively no heating season (tropical/equatorial climate), so winter heat loss is not the driver here. The thermal concern shifts to year-round process heat and humidity/heat-driven corrosion of hot equipment.
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #3 largest hydro power plant of 4 in El Salvador by capacity.
El Salvador has 4 hydro power plants in this dataset, together about 472 MW of capacity.
Coordinates 13.9908, -88.7579 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Cinco de Noviembre Hydroelectric Power Plant El Salvador is a 99 MW source-record hydro power plant in Lempira, El Salvador, commissioned in 1953.
Its output is enough to supply roughly 99,513 homes (estimated).
Cinco de Noviembre Hydroelectric Power Plant El Salvador is operated by Comisión Ejecutiva Hidroeléctrica del Río Lempa [100%].