Cairo South is a 715 MW gas power station in Muhafazat al Qahirah, Egypt. It is operated by Cairo Electricity Production Co [100%]. Based on reported annual generation of 2,947 GWh, it can supply roughly 842k homes. It ranks #27 of 89 Egypt power plants by installed capacity. Commissioned in 1989, it is around 37 years old — long-established. In context, gas supplies about 79.6% of Egypt's electricity; the national grid averages 563 gCO₂/kWh (13.0% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1000069.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.
capacity: WRI Global Power Plant Database source-record (legacy); fuel: WRI source-record fuel
At 715 MW, Cairo South is around the median gas plant in Egypt (682 MW). Technically it is described as CCGT; combined-cycle with a heat-recovery steam generator (HRSG). Gas plants burn natural gas either in open-cycle turbines for fast peaking, or in combined-cycle units that recover exhaust heat in an HRSG to reach roughly 55–62% efficiency — the cleanest-burning fossil option.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by Cairo Electricity Production Co [100%].
This gas plant burns natural gas in a turbine — often in a combined-cycle setup — to generate electricity. It sits in a hot desert climate (Köppen BWh) — Northern Hemisphere, latitude 29.9°N — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 84% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 19/100 — this site sits in the bottom third of the power plants we cover by heating degree-days.
A gas turbine here also runs ~5% below its ISO (15°C) rating at this annual mean (typical CCGT curve, estimate).
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a benign, low-corrosion environment (estimated ISO 9223 class C1 — Very low), with dust abrasion the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #21 largest gas power plant of 48 in Egypt by capacity.
Egypt has 48 gas power plants in this dataset, together about 51,243 MW of capacity.
Coordinates 29.8669, 31.2914 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Cairo South is a 715 MW source-record gas power plant in Muhafazat al Qahirah, Egypt, commissioned in 1989.
Cairo South generates about 2,947 GWh of electricity per year.
Its output is enough to supply roughly 842,000 homes.
Cairo South is operated by Cairo Electricity Production Co [100%].