Bohunice Nuclear Power Plant Slovakia is a 880 MW nuclear power station in Trnavsky, Slovakia. It is operated by Jadrova A Vyradovacia Spolocnost (Nuclear And Decommissioning Company PLC) [100%. Based on reported annual generation of 7,731 GWh, it can supply roughly 2.2 million homes. It ranks #2 of 37 Slovakia power plants by installed capacity. Commissioned in 1972, it is around 54 years old — an older, legacy facility. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, nuclear supplies about 66.4% of Slovakia's electricity; the national grid averages 95 gCO₂/kWh (85.2% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id GEODB0002385.
Data status
Known data
Calculated from dataset
Not available
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
Data provenance
Capacity and fuel are the upstream open-dataset record, not yet matched to a 2026 registry or GEM entry.
capacity: WRI GPPD; fuel: WRI GPPD
In context: how this plant compares
Technically it is described as pressurized water reactor. Nuclear plants split uranium to raise steam with no direct CO₂; they run as steady baseload with very high capacity factors and the longest operating lifetimes of any thermal plant.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Key facts
- Share of Slovakia nuclear capacity
- 50.0% of 1,760 MW across 2 plants in this dataset
Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).
Capacity vs largest nuclear plants in Slovakia
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Owner
Operated by Jadrova A Vyradovacia Spolocnost (Nuclear And Decommissioning Company PLC) [100%.
Local climate & thermal context
This nuclear plant uses heat from nuclear fission to raise steam for a turbine-generator. It sits in a temperate oceanic climate (Köppen Cfb) — Northern Hemisphere, latitude 48.5°N — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 27% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 66/100 — this site sits in the mid third of the power plants we cover by heating degree-days.
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
Site climate & environmental severity
This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby plants
The #1 largest nuclear power plant of 2 in Slovakia by capacity.
Slovakia has 2 nuclear power plants in this dataset, together about 1,760 MW of capacity.
Nearby power plants
- Malzenice CCGT Power Plant Slovakia · Gas · 436 MW · Trnavsky
- Madunice Hydroelectric Power Plant Slovakia · Hydro · 43.2 MW · Trnavsky
- Horna Streda Hydroelectric Power Plant Slovakia · Hydro · 25.5 MW · Trnavsky
- Nove Mesto n.V. Hydroelectric Power Plant Slovakia · Hydro · 25.5 MW · Trenciansky
- Kostolna Hydroelectric Power Plant Slovakia · Hydro · 25.5 MW · Trenciansky
- Velká nad Veličkou Solar Power Plant · Solar · 3.2 MW · South Moravian
Location
Coordinates 48.496, 17.6816 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Frequently asked questions
What type of power plant is Bohunice Nuclear Power Plant Slovakia?
Bohunice Nuclear Power Plant Slovakia is a 880 MW nuclear power plant in Trnavsky, Slovakia, commissioned in 1972.
How much electricity does Bohunice Nuclear Power Plant Slovakia generate?
Bohunice Nuclear Power Plant Slovakia generates about 7,731 GWh of electricity per year.
Who operates Bohunice Nuclear Power Plant Slovakia?
Bohunice Nuclear Power Plant Slovakia is operated by Jadrova A Vyradovacia Spolocnost (Nuclear And Decommissioning Company PLC) [100%.