Bassano — Canada
Solar power plant in Alberta, Canada. Approximate location 50.7807, -112.46.
SolarAlbertaCanadaPVPre Construction
Bassano is a 2 MW solar power plant in Alberta, Canada. It ranks #1111 of 1,210 Canada power plants by installed capacity. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, solar supplies about 1.6% of Canada's electricity; the national grid averages 191 gCO₂/kWh (77.0% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id CAN0007647.
Data status
Known data
Calculated from dataset
Not available
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
Data provenance
Capacity and fuel are the upstream open-dataset record, not yet matched to a 2026 registry or GEM entry.
capacity: WRI GPPD; fuel: WRI GPPD
In context: how this plant compares
At 2 MW, Bassano is below the median solar plant in Canada (10 MW). Technically it is described as PV. Its current lifecycle status is “Pre Construction” — so it is not yet, or no longer, generating at full output. Solar PV converts sunlight directly into electricity with no moving parts or fuel; output varies by time of day and weather, so it pairs with storage or flexible backup.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
How it compares & nearby plants
The #137 largest solar power plant of 143 in Canada by capacity.
Canada has 143 solar power plants in this dataset, together about 1,823 MW of capacity.
Nearby power plants
- Green Acres · Solar · 2 MW · Alberta
- Bow City power station · Coal · 1,000 MW · Alberta
- Brooks · Solar · 13 MW · Alberta
- Wintering Hills · Wind · 88 MW · Alberta
- Cavalier · Gas · 120 MW · Alberta
- Blackspring Ridge · Wind · 298.8 MW · Alberta
Location
Coordinates 50.7807, -112.46 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Frequently asked questions
What type of power plant is Bassano?
Bassano is a 2 MW solar power plant in Alberta, Canada, Pre Construction 2027.
