Bangkanai II power station is a 140 MW gas power station in Central Kalimantan, Indonesia. It is operated by PT PLN (Persero) [100%]. Based on its capacity (estimated), it can supply roughly 158k homes (estimated). It ranks #222 of 401 Indonesia power plants by installed capacity. Commissioned in 2022, it is around 4 years old — recently built. In context, gas supplies about 18.5% of Indonesia's electricity; the national grid averages 680 gCO₂/kWh (18.1% low-carbon) (2024).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id GOGPT_bangkanaiii_indone.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.
capacity: GEM · 2026 · L100000408064; fuel: GEM GOGPT
At 140 MW, Bangkanai II power station is around the median gas plant in Indonesia (150 MW). Technically it is described as Engine. Gas plants burn natural gas either in open-cycle turbines for fast peaking, or in combined-cycle units that recover exhaust heat in an HRSG to reach roughly 55–62% efficiency — the cleanest-burning fossil option.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by PT PLN (Persero) [100%].
This gas plant burns natural gas in a turbine — often in a combined-cycle setup — to generate electricity. It sits in a tropical rainforest climate (Köppen Af) — Southern Hemisphere, latitude 0.6°S — which shapes how much energy it can produce and how its output varies through the year.
Climate zone & typical temperatures: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #75 largest gas power plant of 138 in Indonesia by capacity.
Indonesia has 138 gas power plants in this dataset, together about 44,657 MW of capacity.
Coordinates -0.62081, 115.114001 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Bangkanai II power station is a 140 MW gas power plant in Central Kalimantan, Indonesia, commissioned in 2022.
Its output is enough to supply roughly 157,680 homes (estimated).
Bangkanai II power station is operated by PT PLN (Persero) [100%].