Home / Africa / Egypt / Arish

Arish — Egypt

Gas power plant in Muhafazat Shamal Sina', Egypt. Approximate location 31.1162, 33.6824.

GasMuhafazat Shamal Sina'EgyptOCGT

Arish is a 250 MW gas power station in Muhafazat Shamal Sina', Egypt. It is operated by Egyptian Electricity Holding Co [100%]. Based on reported annual generation of 545 GWh, it can supply roughly 156k homes. It ranks #45 of 89 Egypt power plants by installed capacity. Commissioned in 1995, it is around 31 years old — long-established. In context, gas supplies about 79.6% of Egypt's electricity; the national grid averages 563 gCO₂/kWh (13.0% low-carbon) (2025).

250MW installed capacity
545GWh reported / yr
155,714homes powered
1995commissioned (~31 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1000083.

Data status

Known data

FacilityArish WRI
CountryEgypt · Muhafazat Shamal Sina' WRI
Coordinates31.1162, 33.6824 WRI
FuelGas WRI
MW installed capacity250 MW GEM · 2026 · L100000407982; operating plant capacity
Verification noteQuality label backfilled from existing source-backed capacity provenance on 2026-07-05; capacity value was not changed. source-verified
OwnerEgyptian Electricity Holding Co [100%] WRI
Commissioned1995 WRI
TechnologyOCGT WRI
GWh reported / yr545 GWh·a⁻¹ WRI

Calculated from dataset

CO₂ emissions218,000 t CO₂·a⁻¹ calculated
Capacity rank in country#45 / 89 calculated
Fuel-specific rank in country#36 / 48 calculated
Capacity vs country/fuel peers0.37× · 682.5 MW · n=48 calculated
Homes-powered equivalent155,714 calculated from reported generation
Climate20.2°C · HDD 458 derived from coordinates
Environmental severityC5 · 57/100 derived from coordinates

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Capacity provenance

The public capacity above is the current source-record value. A 2026 tracker candidate lists 250 MW for Arish power station, but it is not used as the public primary value until scope is verified (unit vs operating vs installed/project total).

Data provenance

Source of the capacity and fuel values:

capacity: GEM · 2026 · L100000407982; fuel: WRI GPPD

In context: how this plant compares

At 250 MW, Arish is below the median gas plant in Egypt (682.5 MW). Technically it is described as OCGT. Gas plants burn natural gas either in open-cycle turbines for fast peaking, or in combined-cycle units that recover exhaust heat in an HRSG to reach roughly 55–62% efficiency — the cleanest-burning fossil option.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Key facts

Load factor
25%, from 545 GWh of reported generation; the median for 30 gas plants in Egypt that report generation is 47%
Share of Egypt gas capacity
0.5% of 51,243 MW across 48 plants in this dataset
Age among peers
11 of 43 dated gas plants in Egypt are older

Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).

Capacity vs largest gas plants in Egypt

Beni Suef power plant: 4,800 MW5kBeni Suef …Burullus power plant: 4,800 MW5kBurullus p…New Capital power station: 4,800 MW5kNew Capita…Kuriemat 2: 2,754 MW3kKuriemat 2North Giza: 2,250 MW2kNorth GizaNubaria: 2,250 MW2kNubariaLuxor Project power station: 2,250 MW2kLuxor Proj…Abu Kir: 2,236 MW2kAbu Kir

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by Egyptian Electricity Holding Co [100%].

Local climate & thermal context

This gas plant burns natural gas in a turbine — often in a combined-cycle setup — to generate electricity. It sits in a hot desert climate (Köppen BWh) — Northern Hemisphere, latitude 31.1°N — which shapes how much energy it can produce and how its output varies through the year.

20.2°Cannual mean temp
458heating degree-days (base 18°C)
1,259cooling degree-days (base 18°C)
53 melevation

Monthly mean temperature

J: 13 °CJF: 14 °CFM: 16 °CMA: 19 °CAM: 21 °CMJ: 25 °CJJ: 27 °CJA: 27 °CAS: 26 °CSO: 23 °CON: 18 °CND: 14 °CD27 °C

Heating degree-days here run 81% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 20/100 — this site sits in the bottom third of the power plants we cover by heating degree-days.

A gas turbine here also runs ~4% below its ISO (15°C) rating at this annual mean (typical CCGT curve, estimate).

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
57/100environmental-severity index
14.1°Cseasonal temperature swing
16 kmdistance to coast

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #36 largest gas power plant of 48 in Egypt by capacity.

Egypt has 48 gas power plants in this dataset, together about 51,243 MW of capacity.

Nearby power plants

Location

Coordinates 31.1162, 33.6824 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is Arish?

Arish is a 250 MW gas power plant in Muhafazat Shamal Sina', Egypt, commissioned in 1995.

How much electricity does Arish generate?

Arish generates about 545 GWh of electricity per year.

Who operates Arish?

Arish is operated by Egyptian Electricity Holding Co [100%].

Built from open public data; no personal information. Operate this site? Request a correction or removal.