Cement Plant in Azerbaijan. Approximate location 40.22469, 49.55794.
Cement PlantAzerbaijanCO₂ reported
Holcim Garadagh Cement Plant is a cement plant in Azerbaijan with a reported capacity of 1,700,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim (Azerbaijan) OJSC. By capacity it ranks #2 of 3 cement plants tracked in Azerbaijan. It emits about 388,063 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 90,458 cars. Its CO₂ per unit of capacity is about 37% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895164.
在1,700,000 t of cement时,Holcim Garadagh Cement Plant是Azerbaijan中cement plant的中位数约 1,700,000 t of cement。 其单位容量的CO₂约为cement plant中位数的低于 31%。 子部门:cement。 作为cement plant,它需要强烈的工艺热量(通常800–1400°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 水泥厂在回转窑中将石灰石加热到1,400°C——是最热的工业过程之一——必须在整个窑长上精确控制温度。
容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Holcim (Azerbaijan) OJSC. All facilities by this operator →
Holcim Garadagh Cement Plant sits in a cold semi-arid steppe climate zone (Köppen BSk), at 40.2°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 3 cement plants in Azerbaijan by reported capacity.
Coordinates 40.22469, 49.55794. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Holcim Garadagh Cement Plant is a cement plant in Azerbaijan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Holcim Garadagh Cement Plant has a reported capacity of 1,700,000 t of cement.
Holcim Garadagh Cement Plant emits about 388,063 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 90,458 cars. That ranks #4 among tracked facilities in Azerbaijan.
Holcim Garadagh Cement Plant is in Azerbaijan, near coordinates 40.22469, 49.55794.
Holcim Garadagh Cement Plant is operated by Holcim (Azerbaijan) OJSC.