Home / Asia / Azerbaijan / Steel plants / Baku Steel Company steel plant

Baku Steel Company steel plant

Steel Plant in Azerbaijan. Approximate location 40.4308, 49.88772.

Steel PlantAzerbaijanCO₂ reported

Baku Steel Company steel plant is a steel plant in Azerbaijan with a reported capacity of 800,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Baku Steel Company QSC. It emits about 133,350 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 31,084 cars. Its CO₂ per unit of capacity is about 69% below the median steel plant.

800,000t of steel
133,350t CO₂e / yr (Climate TRACE)
#7CO₂ rank in Azerbaijan
0.17t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566435.

在上下文中:该设施如何比较

在800,000 t of steel时,Baku Steel Company steel plant是Azerbaijan中steel plant的中位数约 800,000 t of steel。 子部门:iron-and-steel。 作为steel plant,它需要强烈的工艺热量(通常800–1500°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 钢铁厂在高炉中燃烧煤炭或使用电弧熔化废料;在两种情况下,熔融金属都必须保持在1,500°C以上并通过广泛的热管和容器转移。

容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。

What 133,350 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

31,084cars driven for a year
17,390homes' annual energy use
2,222,500tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Operator

Operated by Baku Steel Company QSC. All facilities by this operator →

Local climate

Baku Steel Company steel plant sits in a cold semi-arid steppe climate zone (Köppen BSk), at 40.4°N in the northern hemisphere.

~10°Ctypical annual mean
~23°Ctypical warm-season
Cold semi-arid steppe: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates 40.4308, 49.88772. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Baku Steel Company steel plant?

Baku Steel Company steel plant is a steel plant in Azerbaijan. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Baku Steel Company steel plant?

Baku Steel Company steel plant has a reported capacity of 800,000 t of steel.

How much CO₂ does Baku Steel Company steel plant emit?

Baku Steel Company steel plant emits about 133,350 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 31,084 cars. That ranks #7 among tracked facilities in Azerbaijan.

Where is Baku Steel Company steel plant located?

Baku Steel Company steel plant is in Azerbaijan, near coordinates 40.4308, 49.88772.

Who operates Baku Steel Company steel plant?

Baku Steel Company steel plant is operated by Baku Steel Company QSC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.