Home / Asia / Saudi Arabia / Steel plants / Al Qaryan steel plant

Al Qaryan steel plant

Steel Plant in Saudi Arabia. Approximate location 26.28253, 49.95605.

Steel PlantSaudi ArabiaCO₂ reported

Al Qaryan steel plant is a steel plant in Saudi Arabia with a reported capacity of 700,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). By capacity it ranks #6 of 6 steel plants tracked in Saudi Arabia. It emits about 910,474 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 212,232 cars. Its CO₂ per unit of capacity is about 141% above the median steel plant.

700,000t of steel
910,474t CO₂e / yr (Climate TRACE)
#38CO₂ rank in Saudi Arabia
1.30t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42741845.

在上下文中:该设施如何比较

在700,000 t of steel时,Al Qaryan steel plant是Saudi Arabia中steel plant的中位数低于 1,200,000 t of steel。 其单位容量的CO₂约为steel plant中位数的高于 138%。 子部门:iron-and-steel。 作为steel plant,它需要强烈的工艺热量(通常800–1500°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 钢铁厂在高炉中燃烧煤炭或使用电弧熔化废料;在两种情况下,熔融金属都必须保持在1,500°C以上并通过广泛的热管和容器转移。

容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。

What 910,474 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

212,232cars driven for a year
118,737homes' annual energy use
15,174,567tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Saudi Arabia

SABIC Hadeed Al Jubail steel plant: 6,000,000 t of steel6.0MSABIC Hade…Al Ittefaq Arab Steel Dammam plant: 2,600,000 t of steel2.6MAl Ittefaq…Solb Steel Jizan plant: 1,200,000 t of steel1.2MSolb Steel…Al Ittefaq National Steel Dammam plant: 1,000,000 t of steel1000kAl Ittefaq…Rajhi Al Assemah Steel Jeddah plant: 850,000 t of steel850kRajhi Al A…Al Qaryan steel plant: 700,000 t of steel700kAl Qaryan …

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Al Qaryan steel plant sits in a hot desert climate zone (Köppen BWh), at 26.3°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #6 largest of 6 steel plants in Saudi Arabia by reported capacity.

Nearby industrial sites

Location

Coordinates 26.28253, 49.95605. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Al Qaryan steel plant?

Al Qaryan steel plant is a steel plant in Saudi Arabia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Al Qaryan steel plant?

Al Qaryan steel plant has a reported capacity of 700,000 t of steel.

How much CO₂ does Al Qaryan steel plant emit?

Al Qaryan steel plant emits about 910,474 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 212,232 cars. That ranks #38 among tracked facilities in Saudi Arabia.

Where is Al Qaryan steel plant located?

Al Qaryan steel plant is in Saudi Arabia, near coordinates 26.28253, 49.95605.

Built from open public data; no personal information. Operate this site? Request a correction or removal.