Villa Fortabat Cement Plant — Argentina
Cement Plant in Argentina. Approximate location -36.99377, -60.27575.
Cement PlantArgentinaCO₂ estimate (modelled)
Villa Fortabat Cement Plant is a cement plant in Argentina. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Loma Negra Compania Industrial Argentina SA. It emits about 551,151 t CO₂e a year from Climate TRACE. That is 2.6% of the CO₂e from the 33 facilities in Argentina that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895117.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Midlothian Cement Plant · 550,689 t CO₂e/yr · United States
- Tepebaşı Cement Plant · 550,556 t CO₂e/yr · Türkiye
- Bandar Khamir Cement Plant · 550,087 t CO₂e/yr · Iran
- Birkenhead Cement Plant · 552,941 t CO₂e/yr · Australia
- Kyangin Hinthada Cement Plant · 548,362 t CO₂e/yr · Myanmar
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- CT OLAVARRIA · Gas · 39 MW · 7 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 551,151 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 551k t CO₂e/yr (Scope 1), Villa Fortabat Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 551k t at the EU CBAM rate (€75/t) is €41.5M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Loma Negra Compania Industrial Argentina SA. All facilities by this operator →
Local climate
Villa Fortabat Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 37.0°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1361 W/m² to ambient — roughly 1.05× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Cementos Avellaneda Olavarría Plant · Cement Plant · 628,958 t CO₂
- Loma Negra Compania Industrial Argentina Olavarría Plant · Cement Plant · 1,390,722 t CO₂
Location
Coordinates -36.99377, -60.27575. View on OpenStreetMap.
Frequently asked questions
What type of facility is Villa Fortabat Cement Plant?
Villa Fortabat Cement Plant is a cement plant in Argentina. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Villa Fortabat Cement Plant emit?
The page uses about 551,151 t CO₂e/year from the open dataset It ranks #12 among facilities in Argentina by estimated CO₂.
Where is Villa Fortabat Cement Plant located?
Villa Fortabat Cement Plant is in Argentina at approximately -36.99377, -60.27575.
Who operates Villa Fortabat Cement Plant?
The operator recorded in the open dataset is Loma Negra Compania Industrial Argentina SA.
