Loma Negra Compania Industrial Argentina Olavarría Plant
Cement Plant in Argentina. Approximate location -37.03862, -60.29564.
Cement PlantArgentinaCO₂ estimate (modelled)
Loma Negra Compania Industrial Argentina Olavarría Plant is a cement plant in Argentina. Its listed capacity is 6,000,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Loma Negra Compania Industrial Argentina SA. By capacity it ranks #1 among 6 cement plants in Argentina. It emits about 1,390,722 t CO₂e a year from Climate TRACE. That is 6.6% of the CO₂e from the 33 facilities in Argentina that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 36% below the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895116.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- National Cement El Hassana Cement Plant · 1,398,554 t CO₂e/yr · Egypt
- NCL Industries Nalgonda Cement Plant · 1,399,965 t CO₂e/yr · India
- ACC Gagal Cement Plant · 1,379,993 t CO₂e/yr · India
- Rabigh Cement Plant · 1,378,279 t CO₂e/yr · Saudi Arabia
- Chelf Cement Plant · 1,375,040 t CO₂e/yr · Algeria
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- CT OLAVARRIA · Gas · 39 MW · 12 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 6,000,000 t of cement, Loma Negra Compania Industrial Argentina Olavarría Plant is well above the median cement plant in Argentina (2,365,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 1,390,722 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 1.4M t CO₂e/yr (Scope 1), Loma Negra Compania Industrial Argentina Olavarría Plant carries no domestic carbon price — and as a CBAM-covered product, its 1.4M t at the EU CBAM rate (€75/t) is €105M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest cement plants in Argentina
Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Loma Negra Compania Industrial Argentina SA. All facilities by this operator →
Local climate
Loma Negra Compania Industrial Argentina Olavarría Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 37.0°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1361 W/m² to ambient — roughly 1.05× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #1 largest of 6 cement plants in Argentina by listed capacity (Climate TRACE).
Nearby industrial sites
- Villa Fortabat Cement Plant · Cement Plant · 551,151 t CO₂
- Cementos Avellaneda Olavarría Plant · Cement Plant · 628,958 t CO₂
Location
Coordinates -37.03862, -60.29564. View on OpenStreetMap.
Frequently asked questions
What type of facility is Loma Negra Compania Industrial Argentina Olavarría Plant?
Loma Negra Compania Industrial Argentina Olavarría Plant is a cement plant in Argentina. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for Loma Negra Compania Industrial Argentina Olavarría Plant?
The open dataset lists 6,000,000 t of cement of capacity for Loma Negra Compania Industrial Argentina Olavarría Plant.
How much CO₂ does Loma Negra Compania Industrial Argentina Olavarría Plant emit?
The page uses about 1,390,722 t CO₂e/year from the open dataset It ranks #5 among facilities in Argentina by estimated CO₂.
Where is Loma Negra Compania Industrial Argentina Olavarría Plant located?
Loma Negra Compania Industrial Argentina Olavarría Plant is in Argentina at approximately -37.03862, -60.29564.
Who operates Loma Negra Compania Industrial Argentina Olavarría Plant?
The operator recorded in the open dataset is Loma Negra Compania Industrial Argentina SA.
