Sete Lagoas Cement Plant — Brazil
Cement Plant in Brazil. Approximate location -19.51334, -44.27703.
Cement PlantBrazilCO₂ estimate (modelled)
Sete Lagoas Cement Plant is a cement plant in Brazil. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Companhia Nacional de Cimento - CNC Ltda. It emits about 751,408 t CO₂e a year from Climate TRACE. That is 0.54% of the CO₂e from the 130 facilities in Brazil that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895242.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Tasek Corporation Ipoh Cement Plant · 751,698 t CO₂e/yr · Malaysia
- Belevi Cement Plant · 752,833 t CO₂e/yr · Türkiye
- Alcanar Cement Plant · 753,349 t CO₂e/yr · Spain
- India Cements Wadapally Cement Plant · 747,686 t CO₂e/yr · India
- Condorocha Cement Plant · 746,867 t CO₂e/yr · Peru
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Gabriel Passos · Oil · 9 MW · 45 km
- Asja BH · Waste · 4 MW · 48 km
- Igarapé · Oil · 131 MW · 49 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 751,408 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 751k t CO₂e/yr (Scope 1), Sete Lagoas Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 751k t at the EU CBAM rate (€75/t) is €56.6M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Companhia Nacional de Cimento - CNC Ltda. All facilities by this operator →
Local climate
Sete Lagoas Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 19.5°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1294 W/m² to ambient — roughly 0.99× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- National Matozinhos Cement Plant · Cement Plant · 470,349 t CO₂
- Mizu Matozinhos Cement Plant · Cement Plant · 249,741 t CO₂
- CSN Pedro Leopoldo Cement Plant · Cement Plant · 1,193,719 t CO₂
- Lagoa Santa Cement Plant · Cement Plant · 1,679,156 t CO₂
- Petrobras REGAP Refinery · Refinery · 1,064,328 t CO₂
- Gerdau Divinópolis steel plant · Steel Plant · 697,243 t CO₂
Location
Coordinates -19.51334, -44.27703. View on OpenStreetMap.
Frequently asked questions
What type of facility is Sete Lagoas Cement Plant?
Sete Lagoas Cement Plant is a cement plant in Brazil. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Sete Lagoas Cement Plant emit?
The page uses about 751,408 t CO₂e/year from the open dataset It ranks #41 among facilities in Brazil by estimated CO₂.
Where is Sete Lagoas Cement Plant located?
Sete Lagoas Cement Plant is in Brazil at approximately -19.51334, -44.27703.
Who operates Sete Lagoas Cement Plant?
The operator recorded in the open dataset is Companhia Nacional de Cimento - CNC Ltda.
