Home / North America / Mexico / Cement plants / Ramos Arizpe Cement Plant

Ramos Arizpe Cement Plant

Cement Plant in Mexico. Approximate location 25.61239, -100.8673.

Cement PlantMexicoCO₂ estimate (modelled)

Ramos Arizpe Cement Plant is a cement plant in Mexico. Its listed capacity is 1,620,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Holcim México Operaciones SA de CV. By capacity it ranks #11 among 12 cement plants in Mexico. It emits about 469,009 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 109k passenger cars. Its CO₂ per unit of capacity is 20% below the national median for this sector.

1,620,000t of cement
469,009t CO₂e / yr (Climate TRACE)
#25CO₂ rank in Mexico
0.29t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897506.

Data status

Known source data

FacilityRamos Arizpe Cement Plant Climate TRACE
CountryMexico Climate TRACE
Coordinates25.61239, -100.8673 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity1,620,000 t of cement Climate TRACE
Owner / operatorHolcim México Operaciones SA de CV Climate TRACE
Modelled CO₂e469,009 t/yr Climate TRACE

Calculated from the dataset

Mexico rank#25 of 62 · top 40.3% calculated
Global cement rank#1236 of 2113 · top 58.5% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 1,620,000 t of cement, Ramos Arizpe Cement Plant is below the median cement plant in Mexico (2,500,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 469,009 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

109kcars driven for a year
61khomes' annual energy use
7.8 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 469k t CO₂e/yr (Scope 1), Ramos Arizpe Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 469k t at the EU CBAM rate (€75/t) is €35.3M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈9k t–23k t/yr, worth €707k€1.8M, with payback up to 2 years. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

469k t CO₂e / yrScope 1 emissions
€35.3M/yrCBAM exposure on EU exports
9k t–23k t/yr ≈ €707k€1.8MDecarbonization potential

Carbon price: EU CBAM €75/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Capacity vs largest cement plants in Mexico

Tepeaca Cement Plant: 7,600,000 t of cement7.6MTepeaca Ce…Lagunas Cement Plant: 3,400,000 t of cement3.4MLagunas Ce…Huichapan Cement Plant: 3,200,000 t of cement3.2MHuichapan …Apazapan Cement Plant: 2,750,000 t of cement2.8MApazapan C…Cerritos Cement Plant: 2,700,000 t of cement2.7MCerritos C…Tepetzingo Cement Plant: 2,500,000 t of cement2.5MTepetzingo…Tecoman Cement Plant: 2,500,000 t of cement2.5MTecoman Ce…Tepezala Cement Plant: 2,100,000 t of cement2.1MTepezala C…

Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Holcim México Operaciones SA de CV. All facilities by this operator →

Local climate

Ramos Arizpe Cement Plant sits in a hot semi-arid steppe climate zone (Köppen BSh), at 25.6°N in the northern hemisphere.

~23°Ctypical annual mean
~31°Ctypical warm-season
Hot semi-arid steppe: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in a benign, low-corrosion environment (estimated ISO 9223 class C1 — Very low), with dust abrasion the leading environmental stress.

C1ISO 9223 corrosivity (indicative)
34/100environmental-severity index
9.3°Cseasonal temperature swing
334 kmdistance to coast
LowCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1333 W/m² to ambient — roughly 1.02× the loss at a 20 °C reference; removable insulation recovers about 1266 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #11 largest of 12 cement plants in Mexico by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 25.61239, -100.8673. View on OpenStreetMap.

Heat loss & insulation profile

For a cement plant, the main modular-insulation targets are rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves. Typical hot-surface ranges used for screening: 200–1,000 °C.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

A first-pass insulation screen suggests about 10,000 MWh/year of recoverable heat-loss reduction and about 3,500 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

External climate finance your country can access

For energy-efficiency projects around process heat, likely external funding channels include:

CBAM. Exporters of cement, steel, aluminium, fertiliser, hydrogen and electricity to the EU face the Carbon Border Adjustment Mechanism — cutting embedded emissions (efficiency + insulation) lowers the levy.

Sources: country climate-finance facilities and public development-bank programmes.

Frequently asked questions

What type of facility is Ramos Arizpe Cement Plant?

Ramos Arizpe Cement Plant is a cement plant in Mexico. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Ramos Arizpe Cement Plant?

The open dataset lists 1,620,000 t of cement of capacity for Ramos Arizpe Cement Plant.

How much CO₂ does Ramos Arizpe Cement Plant emit?

The page uses about 469,009 t CO₂e/year from the open dataset It ranks #25 among facilities in Mexico by estimated CO₂.

Where is Ramos Arizpe Cement Plant located?

Ramos Arizpe Cement Plant is in Mexico at approximately 25.61239, -100.8673.

Who operates Ramos Arizpe Cement Plant?

The operator recorded in the open dataset is Holcim México Operaciones SA de CV.

Built from open public data; no personal information. Operate this site? Request a correction or removal.